Process gaps of model-based construction cost estimation from selected constellation of actors

被引:0
|
作者
Bender, S. [1 ]
Stoy, C. [1 ]
机构
[1] Univ Stuttgart, Inst Bauokon, Keplerstr 11, D-70174 Stuttgart, Germany
来源
BAUINGENIEUR | 2021年 / 96卷 / 03期
关键词
BIM; ONTOLOGY;
D O I
10.37544/0005-6650-2021-03-38
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The corresponding and determining success factors of construction projects are essentially quality, deadlines and costs. Cost planning is therefore already a component of the planning service in early phases and has a significant influence on the pros and cons of project implementation. Digital tools and new process flows have been established in the construction industry as part of the digitalization process. Model-based construction cost estimation is used in BIM-based construction projects and obtains element sets and information from digital building models, which consist of objects with alphanumeric and graphic properties. The model-based cost planning processes are not sufficiently scientifically proven and are not subject to a standardized procedure. An idealtypical model-based target cost estimation process is determined via literature sources.This cost estimation process is reviewed by expert interviews and their analysis by a qualitative content analysis. The result is an actual cost estimation process from current practice, which describes approach and shows process gaps in the area of integration of specialist planner models as well as cost control and cost management.
引用
收藏
页码:70 / 78
页数:9
相关论文
共 50 条
  • [22] Model-based construction of collaborative systems
    Swaby, MA
    Dew, PM
    Kearney, PJ
    BT TECHNOLOGY JOURNAL, 1999, 17 (04) : 78 - 90
  • [23] Dynamic Simulations in Cost and Time Estimation of the Construction Process
    Beran, V.
    Hromada, E.
    ACTA POLYTECHNICA, 2008, 48 (01) : 30 - 35
  • [24] Construction process cost game based on principal-agent model
    Wang X.-M.
    Xiong J.-J.
    Su Q.-L.
    Kongzhi yu Juece/Control and Decision, 2019, 34 (02): : 390 - 394
  • [25] A Model-based Synthesis Framework for the Execution of Dynamic Dataflow Actors
    Rafique, Omair
    Schneider, Klaus
    2018 INTERNATIONAL CONFERENCE ON INTERNET OF THINGS, EMBEDDED SYSTEMS AND COMMUNICATIONS (IINTEC), 2018, : 177 - 182
  • [26] Model-based estimation of superinfection prevalence from limited datasets
    Reeves, Daniel B.
    Magaret, Amalia S.
    Greninger, Alex L.
    Johnston, Christine
    Schiffer, Joshua T.
    JOURNAL OF THE ROYAL SOCIETY INTERFACE, 2018, 15 (139)
  • [27] PRIMITIVE STUDY ON MODEL-BASED PROCESS IDENTIFICATION BY UTILIZING FORCE ESTIMATION TECHNIQUES
    Suzuki, Norikazu
    Ikeda, Ryosuke
    Shamoto, Eiji
    PROCEEDINGS OF THE ASME 11TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2016, VOL 2, 2016,
  • [28] Model-based production cost estimation to support bid processes: an automotive case study
    Andrea Borenich
    Peter Greistorfer
    Marc Reimann
    Central European Journal of Operations Research, 2020, 28 : 841 - 868
  • [29] COST ESTIMATION MODEL FOR PAN BASED CARBON FIBER MANUFACTURING PROCESS
    Gill, Amaninder Singh
    Visotsky, Darian
    Mears, Laine
    Summers, Joshua D.
    PROCEEDINGS OF THE ASME 11TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2016, VOL 1, 2016,
  • [30] Model-based production cost estimation to support bid processes: an automotive case study
    Borenich, Andrea
    Greistorfer, Peter
    Reimann, Marc
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2020, 28 (03) : 841 - 868