Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP

被引:78
|
作者
Hamidi, Jafar Khademi [1 ]
Shahriar, Kourosh [1 ]
Rezai, Bahram [1 ]
Rostami, Jamal [2 ]
Bejari, Hadi [3 ]
机构
[1] Amir Kabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[2] Penn State Univ, Dept Energy & Mineral Engn, University Pk, PA 16802 USA
[3] Islamic Azad Univ Ghaemshahr, Ghaemshahr, Iran
关键词
Fuzzy-AHP; TBM selection; Adverse geological conditions; Geotechnical risk; TBM performance; Zagros long tunnel;
D O I
10.1007/s10064-009-0260-8
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Uncertainty in geological and geotechnical parameters is inevitable as it is never possible to accurately determine every aspect of the ground conditions along the tunnel alignment during site investigations. As a consequence, there are many potential sources of geotechnical risk in both mechanized and conventional tunneling techniques. Problems such as encountering crushed and fault zones with running gouge, tunnel face and wall instabilities in blocky ground, large quantities of water inflow and converging tunnel sections are the principal geotechnical risks which affect the selection of an appropriate tunnel boring machine. The paper discusses the use of a fuzzy analytical hierarchy process as an efficient means of decision-making, which can take into account the different criteria pertinent to proper machine selection for anticipated ground conditions.
引用
收藏
页码:523 / 532
页数:10
相关论文
共 50 条
  • [1] Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP
    Jafar Khademi Hamidi
    Kourosh Shahriar
    Bahram Rezai
    Jamal Rostami
    Hadi Bejari
    [J]. Bulletin of Engineering Geology and the Environment, 2010, 69 : 523 - 532
  • [2] Fire Risk Assessment of PVC Cables Based on Proved Fuzzy-AHP
    Li Qiang
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 245 - 250
  • [3] Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions
    Shahriar, Kourosh
    Sharifzadeh, Mostafa
    Hamidi, Jafar Khademi
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2008, 23 (03) : 318 - 325
  • [4] Supplier Selection Using Fuzzy-AHP: A Case Study
    Agrawal, Narayan
    Kant, Shashi
    [J]. TRENDS IN MANUFACTURING PROCESSES, ICFTMM 2018, 2020, : 119 - 127
  • [5] A decision analysis model for supplier selection using fuzzy-AHP
    Hwang, Heung Suk
    [J]. PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2005, 4 : 416 - 421
  • [6] Research of Supplier-Selection Method Based on Fuzzy-AHP
    Feng Xunsheng
    Guo Dingjun
    Yao Haifeng
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2812 - 2814
  • [7] Reliability Assessment of Component-Based Software System Using Fuzzy-AHP
    Jasra, Bhat
    Dubey, Sanjay Kumar
    [J]. SOFTWARE ENGINEERING (CSI 2015), 2019, 731 : 663 - 670
  • [8] Safety Assessment for Rooftop Wind Turbines Using Fuzzy-AHP
    Shin, Seok-Hyeon
    Lee, Sam-Chan
    Bae, In-Su
    Kim, Dong-Min
    [J]. Transactions of the Korean Institute of Electrical Engineers, 2024, 73 (06): : 1087 - 1093
  • [9] Risk Evaluation of Highway Engineering Project Based on the Fuzzy-AHP
    Yang, Qian
    Wei, Yajun
    [J]. INTERNATIONAL CONFERENCE ON GRAPHIC AND IMAGE PROCESSING (ICGIP 2011), 2011, 8285
  • [10] Solving Supplier Selection Problem Using Fuzzy-AHP for An Electronic Manufacturer
    Pornsing, Choosak
    Jomtong, Peerapop
    Kanchana-anotai, Jintasak
    Tonglim, Tongtang
    [J]. 2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 824 - 827