摘要
There are many potential sources of geotechnical risk in mechanized rock tunnelling. Problems such as encountering fault zones with running and water bearing gouge, tunnel walls instabilities in running or blocky grounds, hard and abrasive rock sections and convergent tunnel sections are principal causes in geotechnical risk occurrence. On the other hand, the performance of each TBM encountering such conditions will be different. Therefore, using different TBMs will have variable risk levels. This paper is to discuss rock TBM selection based on geotechnical risk minimization. So, a new approach was proposed based on decision analysis using decision tree. Based on the newly proposed approach, the most appropriate TBM is one that has the minimum risk level either before or after hazards mitigation measures. To be able to check the performance of this approach in practice, selection of machine for Nosoud water transfer tunnel has been evaluated. A shielded TBM (either single or double shield one) was proposed for the tunnel based on the newly proposed method. However, a double shield TBM was selected because of its more flexibility in difficult ground conditions in comparison with single shield TBM and limitation of project construction duration. The machine performance during tunnelling period verifies the success of excavation using selected TBM. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:318 / 325
页数:8
相关论文
共 50 条
  • [1] Geotechnical risk management approach for TBM tunnelling in squeezing ground conditions
    Swannell, Nicholas
    Palmer, Michael
    Barla, Giovanni
    Barla, Marco
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 201 - 210
  • [2] Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP
    Jafar Khademi Hamidi
    Kourosh Shahriar
    Bahram Rezai
    Jamal Rostami
    Hadi Bejari
    [J]. Bulletin of Engineering Geology and the Environment, 2010, 69 : 523 - 532
  • [3] Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP
    Hamidi, Jafar Khademi
    Shahriar, Kourosh
    Rezai, Bahram
    Rostami, Jamal
    Bejari, Hadi
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2010, 69 (04) : 523 - 532
  • [4] Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditions
    Sharafat, Abubakar
    Latif, Kamran
    Seo, Jongwon
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 111
  • [5] Geotechnical conditions and TBM selection for the Bay Tunnel
    Erickson, Luke
    Raleigh, Peter
    Romero, Victor
    [J]. NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 389 - 398
  • [6] A Risk Assessment System for Hard Rock TBM Selection Based on Bayesian Belief Networks (BBN)
    Zhao, Feng
    Xue, Yadong
    Li, Yanjie
    Zhao, Hanxiang
    [J]. GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 454 - 467
  • [7] Fundamental TBM selection criteria in urban environment based on engineering geological and geotechnical conditions
    Papouli, D.
    Marinos, V.
    [J]. PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 1372 - 1380
  • [8] Mechanical performance of TBM cutterhead in mixed rock ground conditions
    Geng, Qi
    Wei, Zhengying
    Meng, Hao
    Macias, Francisco Javier
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 76 - 84
  • [9] An appraisal of TBM performances in Turkey in difficult ground conditions and some recommendations
    Bilgin, Nuh
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 265 - 276
  • [10] Selection of TBM and geotechnical assessment of a microtunnel in a difficult geological environment: a case of a natural gas pipeline beneath an active landslide (Albania)
    Marinos, Vassilis
    Stoumpos, Georgios
    Papouli, Dimitra
    Papazachos, Costas
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (03) : 1795 - 1813