WRF model for precipitation simulation and its application in real-time flood forecasting in the Jinshajiang River Basin, China

被引:15
|
作者
Zhou, Jianzhong [1 ,2 ]
Zhang, Hairong [1 ,2 ]
Zhang, Jianyun [3 ]
Zeng, Xiaofan [1 ,2 ]
Ye, Lei [4 ]
Liu, Yi [1 ,2 ]
Tayyab, Muhammad [1 ,2 ]
Chen, Yufan [5 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China
[2] Hubei Key Lab Digital Valley Sci & Technol, Wuhan 430074, Hubei, Peoples R China
[3] Nanjing Hydraul Res Inst, State Key Lab Hydrol Water Resources & Hydraul En, Nanjing 210098, Jiangsu, Peoples R China
[4] Dalian Univ Technol, Sch Hydraul Engn, Dalian 116024, Peoples R China
[5] China Yangtze Power Co Ltd, Yichang 443002, Peoples R China
基金
国家自然科学基金重大研究计划; 中国国家自然科学基金; 国家重点研发计划;
关键词
PHYSICAL PARAMETERIZATIONS; SCE-UA; SENSITIVITY;
D O I
10.1007/s00703-017-0542-9
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
An accurate flood forecasting with long lead time can be of great value for flood prevention and utilization. This paper develops a one-way coupled hydro-meteorological modeling system consisting of the mesoscale numerical weather model Weather Research and Forecasting (WRF) model and the Chinese Xinanjiang hydrological model to extend flood forecasting lead time in the Jinshajiang River Basin, which is the largest hydropower base in China. Focusing on four typical precipitation events includes: first, the combinations and mode structures of parameterization schemes of WRF suitable for simulating precipitation in the Jinshajiang River Basin were investigated. Then, the Xinanjiang model was established after calibration and validation to make up the hydro-meteorological system. It was found that the selection of the cloud microphysics scheme and boundary layer scheme has a great impact on precipitation simulation, and only a proper combination of the two schemes could yield accurate simulation effects in the Jinshajiang River Basin and the hydro-meteorological system can provide instructive flood forecasts with long lead time. On the whole, the one-way coupled hydro-meteorological model could be used for precipitation simulation and flood prediction in the Jinshajiang River Basin because of its relatively high precision and long lead time.
引用
收藏
页码:635 / 647
页数:13
相关论文
共 50 条
  • [21] On the adaptive component of a real-time flood forecasting model
    Corradini, C.
    Flammini, A.
    Morbidelli, R.
    Saltalippi, C.
    PROCEEDINGS OF THE 17TH IASTED INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, 2006, : 568 - +
  • [22] Integrating WRF forecasts at different scales for pluvial flood forecasting using a rainfall threshold approach and a real-time flood model
    Young, Adele
    Bhattacharya, Biswa
    Daniels, Emma
    Zevenbergen, Chris
    JOURNAL OF HYDROLOGY, 2025, 656
  • [23] Real-time correction method of flood forecasting for the upper Huaihe River Basin based on cointegration theory
    Zhang, Xumin
    Qu, Simin
    Li, Qian
    Shi, Peng
    Ji, Haixiang
    Song, Lanlan
    Wang, Qidong
    Water Resources Protection, 2022, 38 (06) : 88 - 96
  • [24] Application of Artificial Neural Networks for Accuracy Enhancements of Real-Time Flood Forecasting in the Imjin Basin
    Jabbari, Aida
    Bae, Deg-Hyo
    WATER, 2018, 10 (11)
  • [25] Application of hydrometeorological coupled European flood forecasting operational real time system in Yellow River Basin
    Yan, Yi-qi
    Tao, Xin
    Li, Bing-quan
    Mazzetti, Cinzia
    WATER SCIENCE AND ENGINEERING, 2009, 2 (04) : 28 - 39
  • [26] Application of hydrometeorological coupled European flood forecasting operational real time system in Yellow River Basin
    Cinzia MAZZETTI
    WaterScienceandEngineering, 2009, 2 (04) : 28 - 39
  • [27] An Improved Grid-Xinanjiang Model and Its Application in the Jinshajiang Basin, China
    Meng, Changqing
    Zhou, Jianzhong
    Zhong, Deyu
    Wang, Chao
    Guo, Jun
    WATER, 2018, 10 (09)
  • [28] Real-time flood forecasting in the middle and lower reaches of the Yangtze River
    Shi, Yong
    Luan, Zhen-Yu
    Chen, Lian-Gang
    Jin, Qiu
    Shuikexue Jinzhan/Advances in Water Science, 2010, 21 (06): : 847 - 852
  • [29] Statistical characteristics of a real-time precipitation forecasting model
    Gaudet, B
    Cotton, WR
    WEATHER AND FORECASTING, 1998, 13 (04) : 966 - 982
  • [30] Functional networks in real-time flood forecasting - a novel application
    Bruen, M
    Yang, JQ
    ADVANCES IN WATER RESOURCES, 2005, 28 (09) : 899 - 909