Determinants of cost deviations and overruns in UK transport projects

被引:2
|
作者
Catalao, Francisco Pinheiro [1 ]
Cruz, Carlos Oliveira [2 ]
Sarmento, Joaquim Miranda [3 ]
机构
[1] Univ Europeia, Sch Business & Social Sci, Estr Correia, Lisbon, Portugal
[2] Univ Lisbon, CERIS, Inst Super Tecn, Lisbon, Portugal
[3] Univ Lisbon, ISEG Lisbon Sch Econ & Management, Adv CSG, Lisbon, Portugal
关键词
procurement; public policy; transport planning;
D O I
10.1680/jtran.20.00067
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost deviations have long been a relevant research topic within the field of public works and infrastructure. Attempts to evaluate the frequency of cost deviations and overruns (CDOs), and the magnitude of these deviations, have been reported in the literature. Using data published by the UK National Audit Office in the period 1985-2018, a unique overview of 175 UK transport projects is provided in this paper. The aim of this work was to evaluate CDOs in the UK and to identify the main determinants, with a focus on exogenous determinants (context-related), which have been neglected in the existing literature. The results confirm that transport projects show a tendency towards overruns, although there are significant differences between road projects (with an average deviation of 18%) and other types of transport projects (with an average deviation of 60%). The results show that an increase in government efficiency levels leads to a decrease in cost overruns. The findings support an existing theory that there is evidence of the existence of political determinants in cost overruns, but also that economic dynamics play a role in explaining cost overruns. Whether the political bias is psychologically or strategically driven is yet to be demonstrated.
引用
收藏
页码:312 / 322
页数:11
相关论文
共 50 条
  • [1] The determinants of cost deviations and overruns in transport projects, an endogenous models approach
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. TRANSPORT POLICY, 2019, 74 : 224 - 238
  • [2] Exogenous determinants of cost deviations and overruns in local infrastructure projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2019, 37 (12) : 697 - 711
  • [3] Different cost performance: different determinants? The case of cost overruns in Dutch transport infrastructure projects
    Cantarelli, C. C.
    van Wee, B.
    Molin, E. J. E.
    Flyvbjerg, B.
    [J]. TRANSPORT POLICY, 2012, 22 : 88 - 95
  • [4] Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. PUBLIC ORGANIZATION REVIEW, 2023, 23 (03) : 1105 - 1126
  • [5] Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects
    Francisco Pinheiro Catalão
    Carlos Oliveira Cruz
    Joaquim Miranda Sarmento
    [J]. Public Organization Review, 2023, 23 : 1105 - 1126
  • [6] Determinants of budget overruns on IT projects
    Calisir, F
    Gumussoy, CA
    [J]. TECHNOVATION, 2005, 25 (06) : 631 - 636
  • [7] How common and how large are cost overruns in transport infrastructure projects?
    Flyvbjerg, B
    Holm, MKS
    Buhl, SL
    [J]. TRANSPORT REVIEWS, 2003, 23 (01) : 71 - 88
  • [8] DEVELOPMENT COST - DETERMINANTS AND OVERRUNS
    SCHNEE, JE
    [J]. JOURNAL OF BUSINESS, 1972, 45 (03): : 347 - 374
  • [9] Federal projects experience cost overruns
    不详
    [J]. CIVIL ENGINEERING, 1999, 69 (11): : 28 - 28
  • [10] The Determinants of Time Overruns in Portuguese Public Projects
    Catalao, Francisco Pinheiro
    Cruz, Carlos Oliveira
    Sarmento, Joaquim Miranda
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (02)