The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project

被引:48
|
作者
Kabirifar, Kamyar [1 ]
Mojtahedi, Mohammad [1 ]
机构
[1] Univ New South Wales, Fac Built Environm, Sydney, NSW 2052, Australia
关键词
EPC projects; project Performance; triple constraints; TOPSIS; CRITICAL SUCCESS FACTORS; MANAGEMENT PERFORMANCE; DECISION-MAKING; DELAY CAUSES; SUSTAINABILITY; DESIGN; COST; TIME; INTEGRATION; FRAMEWORK;
D O I
10.3390/buildings9010015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Construction Industry is a complex and fragmented industry worldwide with regards to its supply chain, products, and processes, and is faced with a similar dilemma as faced by manufacturers during its time in past decades. Scope, time, and cost are the triple constraints of project management and leading factors in defining the project performance. Productivity and efficiency of each construction project is measured through its triple constraints, therefore the factors that affect project success are significantly important. Despite the importance of understanding project performance indicators, few empirical studies have been conducted over the last decade in terms of analyzing the factors that determine the performance of high-rise buildings in Engineering, Procurement, and Construction (EPC) projects. Hence, the aim of this paper is to analyze and rank EPC critical activities across large-scale residential construction projects in Iran, by using the TOPSIS method as a multi-attribute group decision-making technique. Results indicate that engineering design, project planning and controls are significant factors contributing to the project performance. In addition, engineering has a pivotal role in project performance and this significance is followed by the construction phase. On the contrary, all believe procurement is more important than Construction phase.
引用
收藏
页数:15
相关论文
共 50 条
  • [41] An Empirical Study on Organizational Culture of Large-scale Construction Project Organization in China
    Lu Yan
    Chen Shouke
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 632 - 635
  • [42] Cost Early-Warning Model System of Large-Scale Construction Project
    Dai, Jingyi
    Ke, Dandan
    [J]. Computational Intelligence and Neuroscience, 2022, 2022
  • [43] Cost Early-Warning Model System of Large-Scale Construction Project
    Dai, Jingyi
    Ke, Dandan
    [J]. COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [44] Computer-based Large-scale Construction Project Health Diagnosis System
    Tang, Hui
    Shi, Wei
    Xu, Haiyan
    Yang, Chunwei
    Guo, Yi
    Sheng, Lin
    [J]. 2019 6TH INTERNATIONAL CONFERENCE ON BEHAVIORAL, ECONOMIC AND SOCIO-CULTURAL COMPUTING (BESC 2019), 2019,
  • [45] An Evaluation Model of Financing Risk for Large-Scale Water Conservancy Construction Project
    Su, Wangshu
    Zhang, Wang
    [J]. PROCEEDINGS 2016 EIGHTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION ICMTMA 2016, 2016, : 81 - 84
  • [46] Innovation of Large-scale Project Multi-programme Construction Management Mode
    Mao Peng
    Cheng Hu
    Xu Qiaoxiang
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7783 - +
  • [47] Impact of stress on the performance of construction project managers
    Leung, Mei-yung
    Chan, Yee-Shan
    Olomolaiye, Paul
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (08): : 644 - 652
  • [48] Insurance framework of large scale construction project in China
    Lu, Yan
    [J]. PROCEEDINGS OF CRIOCM 2006 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2006, : 806 - 811
  • [49] Impact of Engineering Software on Construction Project Management in Bahrain
    Aqlan, Samer Abdulla
    He Yabo
    [J]. ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 2614 - 2618
  • [50] Effects of cooperative procurement procedures on construction project performance: A conceptual framework
    Eriksson, Per Erik
    Westerberg, Mats
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) : 197 - 208