Online operations strategies for automated multistory parking facilities

被引:14
|
作者
Wang, Yineng [1 ]
Li, Meng [2 ]
Lin, Xi [2 ]
He, Fang [1 ]
机构
[1] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Urban parking; Automated multistory parking facility; Online operations; Reinforcement learning; MORNING COMMUTE; LEVEL;
D O I
10.1016/j.tre.2020.102135
中图分类号
F [经济];
学科分类号
02 ;
摘要
Parking at megacities has become a major problem that is garnering increasing attention. The fundamental cause of the parking problem is the imbalance of demand and supply in core areas, where parking demand is high but parking provision is limited owing to exorbitant land prices. The idea of multistory parking facilities is proposed to serve larger parking demands with fewer land possessions. The newly developed automated multistory parking facilities are able to pick-up and place cars on different stories automatically. This paper proposes online operations method (OOM) of automated multistory parking facilities in response to intensive parking demands to reduce customers' waiting time. The proposed online optimization model is composed of two tiers: in the first tier, a reinforcement learning framework is adopted to determine parking spot selections for incoming parking demands, and the second tier executes the plan acquired from the first tier by optimizing the action sequences of the automated elevator. Numerical experiments with multiple demand patterns are conducted to verify the proposed methodology. The results show that the learned strategy distinguishes from common practice in that it shows non-greedy patterns for some time during the day, and achieves significant improvements in various cases.
引用
收藏
页数:22
相关论文
共 50 条
  • [11] SHORING RESHORING OPERATIONS FOR MULTISTORY BUILDINGS
    STIVAROS, PC
    HALVORSEN, GT
    ACI STRUCTURAL JOURNAL, 1990, 87 (05) : 589 - 596
  • [12] RecorData - Acquisition and validation of operations data - Online optimization of facilities
    Simon, R
    Dorwig, P
    INDUSTRIAL ENERGY MANAGEMENT, 2001, 1593 : 289 - 297
  • [13] Automated Parking
    不详
    BAUINGENIEUR, 2015, 90 : A30 - A30
  • [14] DESIGN OF MULTISTORY SEWAGE-TREATMENT FACILITIES
    YUKI, Y
    TAKAYANAGI, E
    ABE, T
    WATER SCIENCE AND TECHNOLOGY, 1991, 23 (10-12) : 1733 - 1742
  • [15] Seismic fragility assessment of multistory precast concrete parking structures
    Li, Hao
    Zhou, Wei
    JOURNAL OF BUILDING ENGINEERING, 2023, 70
  • [16] Relocating shared automated vehicles under parking constraints: assessing the impact of different strategies for on-street parking
    Winter, Konstanze
    Cats, Oded
    Martens, Karel
    van Arem, Bart
    TRANSPORTATION, 2021, 48 (04) : 1931 - 1965
  • [17] Athens Underground Parking Facilities
    Batsos, D. V.
    Tzouvadakis, I.
    11TH ACUUS INTERNATIONAL CONFERENCE - UNDERGROUND SPACE: EXPANDING THE FRONTIERS, 2007, : 119 - 124
  • [18] Relocating shared automated vehicles under parking constraints: assessing the impact of different strategies for on-street parking
    Konstanze Winter
    Oded Cats
    Karel Martens
    Bart van Arem
    Transportation, 2021, 48 : 1931 - 1965
  • [19] Level of Service for Parking Facilities
    He, Yulong
    Sun, Xiaoduan
    Du, Lizhen
    Ruan Jinmei
    Das, Subasish
    2012 15TH INTERNATIONAL IEEE CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2012, : 1161 - 1165
  • [20] Sizing parking facilities at airports
    Javid, Massoud
    Seneviratne, Prianka N.
    Kakimoto, Ryuji
    Journal of Advanced Transportation, 33 (03): : 253 - 272