COLLABORATIVE PLANNING, FORECASTING, AND REPLENISHMENT IMPLEMENTATION: A CASE STUDY OF A MAJOR GROCERY RETAILER IN SOUTH AFRICA

被引:1
|
作者
Niemann, W. [1 ]
Kotzel, T. [1 ]
Jacobs, D. [1 ]
机构
[1] Univ Pretoria, Dept Business Management, Pretoria, South Africa
关键词
TRUST; CHAINS; MODEL;
D O I
10.7166/29-3-1744
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The purpose of this study was to investigate the key factors that affect the implementation of collaborative planning, forecasting, and replenishment (CPFR). A single case study method was adopted, examining a critical case in the South African grocery retail sector. Semi-structured interviews were conducted to collect data. The study confirmed five of the six key factors affecting CPFR implementation that have been identified in the literature. Two new key factors, business understanding and a common goal, were identified. The study also determined the framework that the focal firm used to implement CPFR. The findings aid supply chain managers in understanding and leveraging the key factors that affect the successful implementation of CPFR. The framework can be used for benchmarking and guiding managers through the process of implementing CPFR.
引用
收藏
页码:1 / 16
页数:16
相关论文
共 50 条
  • [31] Devising a strategy for IT governance implementation in municipalities. A case study of South Africa
    Sibanda, Mbusi
    von Solms, Rossouw
    [J]. ELECTRONIC JOURNAL OF INFORMATION SYSTEMS IN DEVELOPING COUNTRIES, 2019, 85 (02):
  • [32] A case study on the implementation of green building construction in Gauteng province, South Africa
    Masia, Thendo
    Kajimo-Shakantu, Kahilu
    Opawole, Akintayo
    [J]. MANAGEMENT OF ENVIRONMENTAL QUALITY, 2020, 31 (03) : 602 - 623
  • [33] Case study: South Africa
    Weyer, Karin
    [J]. BULLETIN OF THE WORLD HEALTH ORGANIZATION, 2007, 85 (05) : 391 - 392
  • [34] Learning curves in collaborative planning, forecasting, and replenishment (CPFR) information systems: An empirical analysis from a mobile phone manufacturer
    Yao, Yuliang
    Kohli, Rajiv
    Sherer, Susan A.
    Cederlund, Jerold
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 2013, 31 (06) : 285 - 297
  • [35] A Web Services-Based Collaborative Planning, Forecasting, and Replenishment (CPFR) Framework for Managing Spare Parts of Semiconductor Equipment
    Chen, Mu-Chen
    Chen, Kai-Ying
    Hsu, Ming-Fu
    Yeh, Cheng-Ta
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2009, 22 (04) : 596 - 600
  • [36] Collaborative continuous replenishment planning process implementation utilizing web services, product ontologies and workflow management systems
    Gialelis, J.
    Kalogeras, A. P.
    Kaklisz, A.
    Koubias, S.
    [J]. 2006 IEEE CONFERENCE ON EMERGING TECHNOLOGIES & FACTORY AUTOMATION, VOLS 1 -3, 2006, : 855 - +
  • [37] The politics of compromise and language planning: The case of South Africa
    Ngcobo, Mtholeni
    [J]. LANGUAGE MATTERS, 2009, 40 (02) : 205 - 214
  • [38] Freshwater conservation planning in South Africa: Milestones to date and catalysts for implementation
    Roux, Dirk J.
    Nel, Jeanne L.
    [J]. WATER SA, 2013, 39 (01) : 151 - 163
  • [39] Planning and case study method in Africa
    Mohebbi, Mehri
    [J]. URBAN DESIGN INTERNATIONAL, 2015, 20 (04) : 312 - 313
  • [40] Planning and case study method in Africa
    Mehri Mohebbi
    [J]. URBAN DESIGN International, 2015, 20 : 312 - 313