The research on the management of project group for flexibility based on Fuzzy Comprehensive Evaluation

被引:0
|
作者
Zhang, Yunning [1 ]
Cai, Youhong [1 ]
机构
[1] Hohai Univ, Sch Business, Nanjing 211100, Jiangsu, Peoples R China
关键词
project group management; flexibility; fuzzy comprehensive evaluation method; the gray relational analysis;
D O I
10.4028/www.scientific.net/AMM.121-126.4842
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Project group is characteristic of dynamic uncertainty and higher complexity, which decides its management methods need to have enough flexibility. Based on the analysis of the flexible influence factors of the project group of management, the paper constructs the project group management flexibility evaluation index system, introduces fuzzy comprehensive evaluation method to the evaluation, and in order to increase its objectivity and feasibility ures the gray correlation analysis method to determine the weights during the process of solving. Finally provides an application example to show that the method is effective and practical.
引用
收藏
页码:4842 / 4846
页数:5
相关论文
共 50 条
  • [1] Research On Risk Management Of Power Engineering Project Based On Fuzzy Comprehensive Evaluation Method
    Li Jia-ming
    [J]. PROCEEDINGS OF THE 2017 2ND JOINT INTERNATIONAL INFORMATION TECHNOLOGY, MECHANICAL AND ELECTRONIC ENGINEERING CONFERENCE (JIMEC 2017), 2017, 62 : 325 - 329
  • [2] Research on Project Risk Management of Power Engineering Based on Fuzzy Comprehensive Evaluation Method
    Zheng Lixin
    [J]. AUTOMATIC CONTROL AND MECHATRONIC ENGINEERING II, 2013, 415 : 287 - 293
  • [3] Study on Project Management Ability Based on Fuzzy Comprehensive Evaluation
    Liu Shaobing
    Yue Pengwei
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2008, : 733 - 737
  • [4] Research of Project Investment Decision Method Based on Fuzzy Comprehensive Evaluation
    Wu Yaoxing
    Chen Zhenghui
    [J]. COMPREHENSIVE EVALUATION OF ECONOMY AND SOCIETY WITH STATISTICAL SCIENCE, 2010, : 241 - +
  • [5] Risk Evaluation Research on A-FUZZY-based Management by Project
    Zhong Chang-bao
    Wu Jia-bao
    Wei Xiao-ping
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10585 - +
  • [6] Research on fuzzy comprehensive evaluation for flexibility of enterprise production system based on grey theory
    Pang Qing-hua
    Du Dong
    [J]. Proceedings of 2006 Chinese Control and Decision Conference, 2006, : 1026 - +
  • [7] MIS Project Risk Management Based on Entropy Weight of the Fuzzy Comprehensive Evaluation
    Rui, Wang
    Hu, Wang
    [J]. PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2009, : 1459 - 1464
  • [8] Research on Quality Evaluation of Group Buying Websites Based on DEA and Fuzzy Comprehensive Evaluation
    Wu, Yanqing
    Yu, Zhuoxi
    Wang, Limin
    [J]. FOURTEENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, 2015, : 105 - 110
  • [9] Research on Performance Evaluation of Construction project based Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation
    Liu, Jinming
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND INNOVATIVE EDUCATION (MSIE 2015), 2015, 32 : 195 - 203
  • [10] Research on the Evolution of Network Group Behavior Based on Fuzzy Comprehensive Evaluation Model
    Tian Bei-da
    Yan Xiang-bin
    Jiang Xi
    [J]. 2018 25TH ANNUAL INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 2018, : 78 - 83