Gust response of a prestressed concrete cable-stayed bridge under cantilever construction

被引:0
|
作者
Niihara, Y [1 ]
Nakano, R [1 ]
Hayashida, K [1 ]
机构
[1] Kajima Tech Res Inst, Tokyo, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A concrete cable-stayed bridge constructed by the cantilever construction method is structurally unstable and the gust response of the deck is unavoidable. In this study, gust response analyses of a long spanned concrete cable-stayed bridge during cantilever erection was performed in both a frequency and a time domain analysis using the results of a full scale measurement and the structural safety of the bridge was discussed.
引用
收藏
页码:1461 / 1464
页数:4
相关论文
共 50 条
  • [1] Simulation of cantilever-casting construction of prestressed concrete cable-stayed bridge
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    Huazhong Ligong Daxue Xuebao, 2008, 4 (115-118):
  • [2] The effect of cable loosening on seismic response of a prestressed concrete cable-stayed bridge
    Wu, Q
    Takahashi, K
    Nakamura, S
    JOURNAL OF SOUND AND VIBRATION, 2003, 268 (01) : 71 - 84
  • [3] Structural behavior of cable anchorage zones in prestressed concrete cable-stayed bridge
    Jo, BW
    Byun, YJ
    Tae, GH
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2002, 29 (01) : 171 - 180
  • [4] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE
    PODOLNY, W
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (01): : 68 - 79
  • [5] Structural response of a concrete cable-stayed bridge under thermal loads
    Tome, Emanuel Sousa
    Pimentel, Mario
    Figueiras, Joaquim
    ENGINEERING STRUCTURES, 2018, 176 : 652 - 672
  • [6] Spatial nonlinear cable force optimum for a prestressed concrete cable-stayed bridge under permanent loads
    Guangzhou Municipal Engineering Quality and Safety Supervision Station, Guangzhou 510050, China
    不详
    Jisuan Lixue Xuebao, 2008, 1 (117-122): : 117 - 122
  • [7] Analysis on dynamic characteristics of partially cable-stayed prestressed concrete bridge
    Shangguan, Ping
    Fang, Zhen-Zheng
    Zhuo, Wei-Dong
    ADVANCES IN STRUCTURAL ENGINEERING:THEORY AND APPLICATIONS VOLS 1 AND 2, 2006, : 1336 - 1341
  • [8] AERODYNAMIC INSTABILITY OF PRESTRESSED CONCRETE CABLE-STAYED BRIDGE WITH NOISE BARRIER
    HONDA, A
    ITO, M
    KIMURA, H
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1992, 42 (1-3) : 1169 - 1180
  • [9] Optimization of cantilever construction of cable-stayed bridge with hybrid deck system
    Dai, Yu-Wen
    Wang, You-Yuan
    He, Jin-Ming
    Bridge Construction, 2014, 44 (04) : 117 - 121
  • [10] Direct simulation of the tensioning process of cable-stayed bridge cantilever construction
    Farre-Checa, J.
    Komarizadehasl, S.
    Ma, Haiying
    Lozano-Galant, J. A.
    Turmo, J.
    AUTOMATION IN CONSTRUCTION, 2022, 137