Integrating routing and scheduling for pipeless plants in different layouts

被引:18
|
作者
Huang, W
Chung, PWH [1 ]
机构
[1] Loughborough Univ Technol, Dept Comp Sci, Loughborough LE11 3TU, Leics, England
[2] Univ Luton, Dept Comp & Informat Syst, Luton LU1 3JU, Beds, England
关键词
scheduling; routing; planning; integration; constraint; pipeless plant;
D O I
10.1016/j.compchemeng.2004.11.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Pipeless batch plants are built to provide the ability to adapt to fast market changes. The scheduling of pipeless plants adds new challenges to the scheduling of conventional batch plants. This is because of the requirement to consider the allocation of resources and also the plant layout so that vessels can move from one processing station to another without conflict. This research investigates the integrated problem of scheduling and routing in pipeless plants and develops a constraint-based methodology suitable for different layouts. During the scheduling process, besides time and resource allocation, a planner is also called to find possible routes to move vessels from one processing station to the next proposed station. Each of the dynamically generated routes is immediately checked for feasible track allocation so that any infeasible route is discarded as soon as possible to save computational time. A typical scheduling problem and results are described in detail to show how this integrated approach works. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1069 / 1081
页数:13
相关论文
共 50 条
  • [31] Development of design support system for pipeless batch plants
    Niwa, T
    Kataoka, M
    Nishitani, H
    KAGAKU KOGAKU RONBUNSHU, 1998, 24 (04) : 620 - 627
  • [32] Pipeless plants move toward new CPI uses
    Kamiya, T
    Fouhy, K
    CHEMICAL ENGINEERING, 1997, 104 (02) : 33 - &
  • [33] Integrating Path Planning, Routing, and Scheduling for Logistics Operations in Manufacturing Facilities
    Xidias, Elias K.
    Nearchou, Andreas C.
    Aspragathos, Nikos A.
    CYBERNETICS AND SYSTEMS, 2012, 43 (03) : 143 - 162
  • [34] POWER ROUTING IN CHANNELLESS FLOORPLAN LAYOUTS
    LURSINSAP, C
    GAJSKI, D
    INTEGRATION-THE VLSI JOURNAL, 1989, 8 (03) : 249 - 268
  • [35] PIPELESS BATCH CHEMICAL-PLANTS OFFER A NEW APPROACH
    SHIMATANI, T
    OKUDA, O
    CHEMICAL ENGINEERING, 1992, 99 (10) : 181 - 182
  • [36] Integrating pricing policies and risk management into scheduling of batch plants
    Guillén, G
    Bagajewicz, M
    Sequeira, SE
    Tona, R
    Espuña, A
    Puigjaner, L
    PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 469 - 474
  • [37] Operation of pipeless batch plants - I. MILP schedules
    Gonzalez, R
    Realff, MJ
    COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (7-8) : 841 - 855
  • [38] Constraint Handling in the Evolutionary Optimization of Pipeless Chemical Batch Plants
    Piana, Sabine
    Engell, Sebastian
    2009 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-5, 2009, : 2547 - 2553
  • [39] Operation of pipeless batch plants - I. MILP schedules
    Gonzalez, Robert
    Realff, Matthew J.
    Computers and Chemical Engineering, 1998, 22 (7-8): : 841 - 855
  • [40] RAPIER: Integrating Routing and Scheduling for Coflow-aware Data Center Networks
    Zhao, Yangming
    Chen, Kai
    Bai, Wei
    Yu, Minlan
    Tian, Chen
    Geng, Yanhui
    Zhang, Yiming
    Li, Dan
    Wang, Sheng
    2015 IEEE CONFERENCE ON COMPUTER COMMUNICATIONS (INFOCOM), 2015,