Risk management in the aeronautical industry: results of an application of two methods

被引:5
|
作者
Fukayama, H. [1 ]
Fernandes, E. [2 ]
Ebecken, N. F. F. [1 ]
机构
[1] Fed Univ Rio Janeiro, Dept Civil Engn, Rio De Janeiro, Brazil
[2] Fed Univ Rio Janeiro, Dept Prod Engn, Rio De Janeiro, Brazil
关键词
risk management; engineering Project Management; Multicriteria Fuzzy Analysis; PMI; PMBok;
D O I
10.2495/RISK080211
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This article presents the results of two risk management methods, applied in the aeronautical industry, during the development of an aircraft for the executive market. The first method is the risk management in accordance with the best practices of Project Management International (PMI), and the second is a proposal of risk management based on Multicriteria Fuzzy Analysis (MFA). The PMI method of risk management is already widely used by the market. Its terminology is quite similar to other international standards of risk management. The MFA risk management method is a new proposal that requires specialist opinions, through a questionnaire, to identify internal and external project risks, measuring their level of threat to the project success. The structure of the questionnaire follows Risk Breakdown Structure (RBS) methodology of the PMI. This new approach generates indicators at three levels: operational, tactical and strategic, which facilitates the monitoring and the management of risks. Despite its complex mathematical base, the MFA method is easier to implement. Both methods reach a similar degree of risk indicators for the project; however, the MFA can be used in an earlier phase of the project, which can avoid some possible earlier risk entanglements. Due to the particularities of each method, both show important contributions to the project risk management. Therefore, complex projects should use both methods to achieve adequate risk management.
引用
收藏
页码:195 / +
页数:2
相关论文
共 50 条
  • [21] OVERWEIGHT AND OBESITY RISK ASSESSMENT - TWO METHODS, DIFFERENT RESULTS
    Pop, Cristiana Lucretia
    [J]. PHYSICAL EDUCATION OF STUDENTS, 2016, 20 (03) : 53 - 57
  • [22] Risk management in industry
    Lehner, U
    Schmidt, M
    [J]. BETRIEBSWIRTSCHAFTLICHE FORSCHUNG UND PRAXIS, 2000, 52 (03): : 261 - 272
  • [23] Application of Taguchi Methods to NextGen Integrated Safety Risk Management
    Bell, Alan
    Unal, Resit
    [J]. 2013 INTEGRATED COMMUNICATIONS, NAVIGATION AND SURVEILLANCE CONFERENCE (ICNS), 2013,
  • [24] Development paths of risk management: approaches, methods and fields of application
    Verbano, Chiara
    Venturini, Karen
    [J]. JOURNAL OF RISK RESEARCH, 2011, 14 (05) : 519 - 550
  • [25] APPLICATION OF TAGUCHI METHODS TO NEXTGEN INTEGRATED SAFETY RISK MANAGEMENT
    Bell, Alan E.
    Unal, Resit
    [J]. 2013 INTEGRATED COMMUNICATIONS, NAVIGATION AND SURVEILLANCE CONFERENCE (ICNS), 2013,
  • [26] A decision framework for risk management, with application to the offshore oil and gas industry
    Aven, T.
    Vinnem, J. E.
    Wiencke, H. S.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2007, 92 (04) : 433 - 448
  • [27] A pilot risk assessment study of strontium chromate among painters in the aeronautical industry
    Lovreglio, P.
    D'Errico, Maria Nicola
    Basso, Antonella
    Ferrara, F.
    Panuzzo, Laura
    Apostoli, P.
    Soleo, L.
    [J]. MEDICINA DEL LAVORO, 2013, 104 (06): : 448 - 459
  • [28] THE APPLICATION OF MODERN METHODS OF CHANGE MANAGEMENT TO OPTIMIZE PROCESSES IN WOOD PROCESSING INDUSTRY
    Simanova, Lubica
    [J]. DIGITALISATION AND CIRCULAR ECONOMY: FORESTRY AND FORESTRY BASED INDUSTRY IMPLICATIONS, 2019, : 201 - 206
  • [29] APPLICATION OF PROJECT MANAGEMENT METHODS AND TOOLS BY CHEMICAL INDUSTRY COMPANIES IN THE CZECH REPUBLIC
    Kostalova, Jana
    Tetrevova, Libena
    [J]. 10TH INTERNATIONAL SCIENTIFIC CONFERENCE BUSINESS AND MANAGEMENT 2018, 2018, : 323 - 332
  • [30] Application of the risk assessment methods of railway transport in Estonian oil shale industry
    Pastarus, J. -R.
    Sabanov, S.
    Tohver, T.
    [J]. OIL SHALE, 2007, 24 (01) : 35 - 44