Integrated model;
Statistical process control;
Maintenance;
Renewal reward process;
ECONOMIC DESIGN;
CONTROL CHART;
PREVENTIVE MAINTENANCE;
POLICIES;
QUALITY;
OPTIMIZATION;
SYSTEMS;
TIME;
D O I:
10.1016/j.cie.2011.07.017
中图分类号:
TP39 [计算机的应用];
学科分类号:
081203 ;
0835 ;
摘要:
The close relationship between quality and maintenance of manufacturing systems has contributed to the development of integrated models, which use the concept of statistical process control (SPC) and maintenance. Such models not only help to improve quality of products but also lead to lower maintenance cost. In this paper, an integrated model is presented which considers complete failure and planned maintenance simultaneously. This model leads to six different scenarios. A new procedure for calculating average cost per time unit is also presented. Finally, a numerical example is used to evaluate sensitivity of the model parameters and compare performance of the developed model to a planned maintenance model. Results indicate satisfactory performance for the developed model. (C) 2011 Elsevier Ltd. All rights reserved.
机构:
King Saud Univ, Coll Engn, Ind Engn Dept, POB 800, Riyadh 11421, Saudi Arabia
Taiz Univ, Coll Engn & IT, Dept Ind & Mfg Syst Engn, Taizi 6803, YemenKing Saud Univ, Coll Engn, Ind Engn Dept, POB 800, Riyadh 11421, Saudi Arabia
Noman, Mohammed A.
论文数: 引用数:
h-index:
机构:
AL-Shayea, Adel
论文数: 引用数:
h-index:
机构:
Nasr, Emad Abouel
论文数: 引用数:
h-index:
机构:
Kaid, Husam
论文数: 引用数:
h-index:
机构:
Al-Ahmari, Abdulrahman
Kamrani, Ali K.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Houston, Coll Engn, Ind Engn Dept, 213 Engn Bldg 2, Houston, TX 77204 USAKing Saud Univ, Coll Engn, Ind Engn Dept, POB 800, Riyadh 11421, Saudi Arabia
Kamrani, Ali K.
Mahmoud, Haitham A.
论文数: 0引用数: 0
h-index: 0
机构:
King Saud Univ, Coll Engn, Ind Engn Dept, POB 800, Riyadh 11421, Saudi Arabia
Helwan Univ, Fac Engn, Mech Engn Dept, Cairo 11732, EgyptKing Saud Univ, Coll Engn, Ind Engn Dept, POB 800, Riyadh 11421, Saudi Arabia