Makespan minimization of a flowshop sequence-dependent group scheduling problem

被引:31
|
作者
Salmasi, Nasser [2 ]
Logendran, Rasaratnam [1 ]
Skandari, Mohammad Reza [2 ]
机构
[1] Oregon State Univ, Sch Mech Ind & Mfg Engn, Corvallis, OR 97331 USA
[2] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
基金
美国国家科学基金会;
关键词
Sequence-dependent group scheduling; Integer programming; Meta-heuristics; Lower bound; Flow shop scheduling; MANUFACTURING CELL; SETUP TIMES; ALGORITHM;
D O I
10.1007/s00170-011-3206-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The flowshop sequence dependent group scheduling problem with minimization of makespan as the objective (F-m vertical bar fmls, S-plk, prmu vertical bar C-max) is considered in this paper. It is assumed that several groups with different number of jobs are assigned to a flow shop cell that has m machines. The goal is to find the best sequence of processing the jobs in each group and the groups themselves with minimization of makespan as the objective. A mathematical model for the research problem is developed in this paper. As the research problem is shown to be NP-hard, a hybrid ant colony optimization (HACO) algorithm is developed to solve the problem. A lower bounding technique based on relaxing a few constraints of the mathematical model developed for the original problem is proposed to evaluate the quality of the HACO algorithm. Three different problem structures, with two, three, and six machines, are used in the generation of the test problems to test the performance of the algorithm and the lower bounding technique developed. The results obtained from the HACO algorithm and those that have appeared in the published literature are also compared. The comparative results show that the HACO algorithm has a superior performance compared to the best available algorithm based on memetic algorithm with an average percentage deviation of around 1.0% from the lower bound.
引用
收藏
页码:699 / 710
页数:12
相关论文
共 50 条
  • [21] Makespan Minimization with Sequence-dependent Non-overlapping Setups
    Vlk, Marek
    Novak, Antonin
    Hanzalek, Zdenek
    [J]. ICORES: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, 2019, : 91 - 101
  • [22] Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
    Keshavarz, Taha
    Salmasi, Nasser
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2014, 8 (03) : 366 - 387
  • [23] Local Search Heuristics for the Flowshop Sequence Dependent Group Scheduling Problem
    Matos Mendes, Nilson Felipe
    Claudio Arroyo, Jose Elias
    Madrid Villadiego, Harlem Mauricio
    [J]. PROCEEDINGS OF THE 2013 XXXIX LATIN AMERICAN COMPUTING CONFERENCE (CLEI), 2013,
  • [24] An enhanced invasive weed optimization for makespan minimization in a flexible flowshop scheduling problem
    [J]. Jolai, F. (fjolai@ut.ac.ir), 1600, Sharif University of Technology (21):
  • [25] Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study
    Ramezanian, Reza
    Vali-Siar, Mohammad Mahdi
    Jalalian, Mahdi
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3311 - 3333
  • [26] A Deep Reinforcement Learning Approach to the Flexible Flowshop Scheduling Problem with Makespan Minimization
    Zhu, Jialin
    Wang, Huangang
    Zhang, Tao
    [J]. PROCEEDINGS OF 2020 IEEE 9TH DATA DRIVEN CONTROL AND LEARNING SYSTEMS CONFERENCE (DDCLS'20), 2020, : 1220 - 1225
  • [27] An enhanced invasive weed optimization for makespan minimization in a flexible flowshop scheduling problem
    Jolai, F.
    Tavakkoli-Moghaddam, R.
    Rabiee, M.
    Gheisariha, E.
    [J]. SCIENTIA IRANICA, 2014, 21 (03) : 1007 - 1020
  • [28] A FLOWSHOP PROBLEM WITH SEQUENCE-DEPENDENT ADDITIVE SETUP TIMES
    SZWARC, W
    GUPTA, JND
    [J]. NAVAL RESEARCH LOGISTICS, 1987, 34 (05) : 619 - 627
  • [29] Historical information based iterated greedy algorithm for distributed flowshop group scheduling problem with sequence-dependent setup times
    He, Xuan
    Pan, Quan-Ke
    Gao, Liang
    Neufeld, Janis S.
    Gupta, Jatinder N. D.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2024, 123
  • [30] An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times
    Karabulut, Korhan
    Oztop, Hande
    Kizilay, Damla
    Tasgetiren, M. Fatih
    Kandiller, Levent
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2022, 142