The construction of four dikes on deep strata of very soft clay has required the application of several measures to improve the performance of the foundation, such as very wide berms, basal geotextile reinforcement and prefabricated vertical drains (PVDs). In order to control the rate of construction, the foundation and the dikes have been monitored with settlement plates, topographic stakes, inclinometers and piezometers. The use of back-analysis has allowed finding the adequate material model, the smearing of drains and the coefficient of secondary compression necessary to attain a good agreement between the measurements supplied by the instrumentation and the calculated values obtained with an elastic-viscoplastic (EVP) finite element (FE) program. Both the geotextile reinforcement and the PVDs produce an important increase in the safety factor (SF). The PVDs produce a significant acceleration in settlements, but the influence of the geotextile in the settlements is negligible. The combined use of the geosynthetic reinforcement and PVDs enhances embankment performance substantially more than the use of either method of soil improvement alone. The importance of flow in the results has been established. (C) 2017 Elsevier Ltd. All rights reserved.
机构:
Ho Chi Minh City Univ Transport, Fac Civil Engn, Ho Chi Minh City, VietnamHo Chi Minh City Univ Transport, Fac Civil Engn, Ho Chi Minh City, Vietnam
机构:
TenCate Geosynthet Asia Sdn Bhd, Shah Alam, Selangor, MalaysiaTenCate Geosynthet Asia Sdn Bhd, Shah Alam, Selangor, Malaysia
Teh, S. I. S.
Tolentino, R.
论文数: 0引用数: 0
h-index: 0
机构:
TenCate Geosynthet Asia Sdn Bhd, Philippine Representat Off, Quezon City, PhilippinesTenCate Geosynthet Asia Sdn Bhd, Shah Alam, Selangor, Malaysia
Tolentino, R.
Laguitao, K.
论文数: 0引用数: 0
h-index: 0
机构:
Arizona Geosynthet Inc, Quezon City, PhilippinesTenCate Geosynthet Asia Sdn Bhd, Shah Alam, Selangor, Malaysia
Laguitao, K.
GEOSYNTHETICS: LEADING THE WAY TO A RESILIENT PLANET, 12ICG 2023,
2024,
: 2031
-
2036