Integrated rolling stock deadhead routing and timetabling in urban rail transit lines

被引:29
|
作者
Wang, Dian [1 ,3 ]
D'Ariano, Andrea [2 ]
Zhao, Jun [1 ,3 ]
Zhong, Qingwei [1 ,3 ]
Peng, Qiyuan [1 ,3 ]
机构
[1] Southwest Jiaotong Univ, Sch Transportat & Logist, Chengdu 611756, Sichuan, Peoples R China
[2] Roma Tre Univ, Dept Engn, I-00146 Rome, Italy
[3] Southwest Jiaotong Univ, Natl United Engn Lab Integrated & Intelligent Tra, Chengdu 611756, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
Transportation; Urban rail transit; Rolling stock scheduling; Deadhead routing and timetabling; Binary linear model; Row and column generation-based; algorithm; TIME-DEPENDENT DEMAND; PASSENGER DEMAND; OPTIMIZATION; CIRCULATION; TRAINS; MODEL; COORDINATION; NETWORK; PLAN;
D O I
10.1016/j.ejor.2021.05.053
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates an integrated rolling stock deadhead routing and timetabling problem from the rolling stock scheduling in a complicated urban rail transit line. Given the train sequences composed of passenger train trips within an operation day, the deadhead routing sub-problem aims at selecting the rolling stock deadhead routes between the depots and the first/last stations of each train sequence. The task of the deadhead timetabling sub-problem is to determine the arrival and departure times of rolling stocks along these selected routes. By means of a time-space network representation, we formulate the studied problem as a new (generalized set partitioning type) binary linear model, to minimize the weighted sum of total deadhead distance and total deadhead running time of rolling stocks during the depot exiting and entering operations. Owing to large numbers of constraints and decision variables in our model, a row and column generation-based algorithm is developed to solve practical-size problems efficiently. A row generation and a column generation are executed iteratively to reduce the numbers of considered constraints and decision variables in our algorithm, respectively. The pricing sub-problem (to identify new variables) in column generation is decomposed into multiple simplified problems, each of which is equivalent to a shortest path problem in the constructed time-space sub-network for any candidate route of each train sequence. These shortest path problems can be solved efficiently by using an existing shortest path algorithm. Computational experiments on a set of hypothetical, realistic, and real world instances demonstrate that our approach can compute both tight lower bounds and (near-)optimal solutions (with a maximum relative optimality gap of 1.07%) for all the tested instances within a maximum computation time of approximately 3 hours for the studied tactical problem. Furthermore, our best-known solution for the real-world instance is better than the empirical solution designed by the rail managers mainly based on experience. (c) 2021 Elsevier B.V. All rights reserved.
引用
下载
收藏
页码:526 / 559
页数:34
相关论文
共 50 条
  • [31] Collaborative Optimization of Urban Rail Transit Timetable and Rolling Stock Circulation Under Tidal Passenger Flow
    Li S.-J.
    Shang Y.-X.
    Liu Z.-G.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2023, 23 (04): : 175 - 183
  • [32] Urban Rail Transit Freight Train Service Planning and Shipment Allocation Considering Rolling Stock Circulation
    Xiao Y.-L.
    Bai Y.
    Chen Y.
    Li Z.-J.
    Wen F.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2023, 23 (06): : 185 - 195
  • [33] A hybrid column generation approach for solving rolling stock assignment optimization model of urban rail transit
    School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China
    不详
    Zhongguo Tiedao Kexue, 1 (122-129):
  • [34] Train timetabling for an urban rail transit line using a Lagrangian relaxation approach
    Hassannayebi, Erfan
    Zegordi, Seyed Hessameddin
    Yaghini, Masoud
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (23-24) : 9892 - 9913
  • [35] Integrated Optimization of Train Formation Plan and Rolling Stock Scheduling with Multiple Turnaround Operations Under Uneven Demand in an Urban Rail Transit Line
    Zhao, Y. Q.
    Li, D. W.
    Yin, Y. H.
    Dong, X. L.
    Zhang, S. L.
    2020 IEEE 23RD INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2020,
  • [36] Integrated Model for Timetabling and Circulation Planning on an Urban Rail Transit Line: a Coupled Network-Based Flow Formulation
    Pan Shang
    Yu Yao
    Liya Yang
    Lingyun Meng
    Pengli Mo
    Networks and Spatial Economics, 2021, 21 : 331 - 364
  • [37] Integrated Model for Timetabling and Circulation Planning on an Urban Rail Transit Line: a Coupled Network-Based Flow Formulation
    Shang, Pan
    Yao, Yu
    Yang, Liya
    Meng, Lingyun
    Mo, Pengli
    NETWORKS & SPATIAL ECONOMICS, 2021, 21 (02): : 331 - 364
  • [38] Collaborative Optimization of Rolling Stock Operation and Maintenance of Urban Rail Transit under All-Day Operation
    Peng Q.
    Liao P.
    He B.
    Li L.
    Zhongguo Tiedao Kexue/China Railway Science, 2022, 43 (06): : 194 - 206
  • [39] Integrated optimization of regular train schedule and train circulation plan for urban rail transit lines
    Wang, Yihui
    Tang, Tao
    Ning, Bin
    Meng, Lingyun
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 105 : 83 - 104
  • [40] The Impact of Short Routing on the Line Capacity of Urban Rail Transit
    Ge, Yi
    Mao, Baohua
    Chen, Yao
    PROCEEDINGS OF THE 2018 INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC, CONTROL AND AUTOMATION ENGINEERING (MECAE 2018), 2018, 149 : 84 - 87