Fast service restoration for large-scale distribution systems with priority customers and constraints

被引:96
|
作者
Miu, KN
Chiang, HD
Yuan, BT
Darling, G
机构
[1] Cornell Univ, Sch Elect Engn, Ithaca, NY 14853 USA
[2] NYSE&G Corp, Elect Transmiss & Distribut, Binghamton, NY 13902 USA
关键词
D O I
10.1109/59.708643
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A fast, effective service restoration method is designed for large-scale distribution systems with priority customers. The service restoration problem is formulated as a constrained multi-objective optimization problem. A ranking-based search method employing analytical information obtained from three-phase power flow simulations is designed to restore service to as many priority customers as possible while maximizing the amount of total load restored and minimizing the number of required switch operations. The proposed method is designed with consideration to networks which have predominantly manual switches. Comprehensive simulation results of the search method, including priority customers, single and multiple faults and multiple out-of-service;areas are presented for a 416 bus distribution network.
引用
收藏
页码:789 / 795
页数:7
相关论文
共 50 条
  • [31] Staffing large-scale service systems with distributional uncertainty
    Ying Chen
    John J. Hasenbein
    Queueing Systems, 2017, 87 : 55 - 79
  • [32] Staffing large-scale service systems with distributional uncertainty
    Chen, Ying
    Hasenbein, John J.
    QUEUEING SYSTEMS, 2017, 87 (1-2) : 55 - 79
  • [33] Responding to Unexpected Overloads in Large-Scale Service Systems
    Perry, Ohad
    Whitt, Ward
    MANAGEMENT SCIENCE, 2009, 55 (08) : 1353 - 1367
  • [34] Distributed Speed Scaling in Large-Scale Service Systems
    Rutten D.
    Zubeldia M.
    Mukherjee D.
    Performance Evaluation Review, 2024, 52 (01): : 95 - 96
  • [35] Distributed Rate Scaling in Large-Scale Service Systems
    Rutten D.
    Zubeldia M.
    Mukherjee D.
    Performance Evaluation Review, 2023, 51 (02): : 21 - 23
  • [36] Incorporating customers' reliability requirements and interruption characteristics in service restoration plans for distribution systems
    Zidan, Aboelsood
    El-Saadany, E. F.
    ENERGY, 2015, 87 : 192 - 200
  • [37] Lagrangean relaxation for service location in large-scale networks with QoS constraints
    Kamal, Zille Huma
    Al-Fuqaha, Ala
    Gupta, Ajay
    WIRELESS COMMUNICATIONS & MOBILE COMPUTING, 2009, 9 (12): : 1668 - 1682
  • [38] Optimal control and stabilisation for large-scale systems with imposed constraints
    Qi, Qingyuan
    Ju, Peijun
    Zhang, Huanshui
    Cui, Peng
    IET CONTROL THEORY AND APPLICATIONS, 2020, 14 (10): : 1300 - 1307
  • [39] Three-Stage Priority List Unit Commitment for Large-Scale Power Systems Considering Ramp Rate Constraints
    Elsayed, Abdullah M.
    Maklad, Ahmed M.
    Farrag, Sobhy M.
    IEEE Canadian Journal of Electrical and Computer Engineering, 2021, 44 (03): : 329 - 342
  • [40] Constraints derivation and propagation for large-scale embedded systems exploration
    Nicolae, L
    Deprettere, E
    COMPUTER SYSTEMS: ARCHITECTURES, MODELING, AND SIMULATION, 2004, 3133 : 550 - 559