Effects of General Contractor's Loading Strategies on Project and Trades' Performance

被引:0
|
作者
Javanmardi, Ashtad [1 ]
Hsiang, Simon M. [2 ]
Liu, Min [1 ]
机构
[1] North Carolina State Univ, Dept Civil Construct & Environm Engn, Campus Box 7908, Raleigh, NC 27695 USA
[2] Univ North Carolina Charlotte, Dept Syst Engn & Engn Management, Charlotte, NC 28223 USA
关键词
FLOW; VARIABILITY; GAME;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
General contractor's (GC) loading strategies, defined as the amount of work GC assigns to trades in a given time, directly impact project and trades' performance. Previous researchers have discussed that it is beneficial not to load 100% of trades production capacity and account for variability in the flow of work passing from one trade to another. However, there has been limited research identifying to what extent underloading is beneficial for both trades and the project. By modifying the Parade Game model and considering different levels of workflow variability, this paper quantifies the effects of GC's loading strategies on project cycle time and trades' utilization. This study simulates a single-line production system in which GC controls the rate of work assigned to the production system. Results show that: (1) although underloading will result in shorter cycle times, 40% underloading could lower trades' average utilization up to 34%; and (2) in a variable production system with a coefficient of variation (CV) of 0.71, variability should be reduced 1.625 times more to achieve a short cycle time of 6 weeks but 14% more trades' average utilization, considering 70% trades' average utilization as a benchmark. The findings of this paper will be useful to project managers by enabling them to develop production strategies that lead to better project cycle time and trades' utilization.
引用
收藏
页码:449 / 459
页数:11
相关论文
共 50 条
  • [1] Effects of the General Contractor's Governance Capabilities and Project Goals on the Organizational Arrangement of Subcontracting
    Tang, Yinqiu
    Chen, Yongqiang
    Arditi, David
    Meng, Fansheng
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, 70 (05) : 1724 - 1737
  • [2] Environmental Risk Assessment of General Contractor's EPC Project
    Li, Wangqing
    Song, Li
    [J]. ADVANCED RESEARCH ON ENGINEERING MATERIALS, ENERGY, MANAGEMENT AND CONTROL, PTS 1 AND 2, 2012, 424-425 : 389 - 394
  • [3] Research on the Relationship between Contractor's Project Competence and Performance
    Xu, Dongming
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 846 - 849
  • [4] General contractor for the shell performance
    Schäfer, A
    [J]. WOCHENBLATT FUR PAPIERFABRIKATION, 2000, 128 (16): : 1066 - 1066
  • [5] GENERAL CONTRACTOR PROJECT CONTROL PRACTICES AND MIS
    RUSSELL, AD
    TRIASSI, E
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1982, 108 (03): : 419 - 437
  • [6] The effects of cost-based contractor selection on construction project performance
    Olaniran, Olugbenga
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2015, 20 (03) : 235 - 251
  • [7] Effects of Pavement Spatial Variability on Contractor's Management Strategies
    Kim, Seok
    Damnjanovic, Ivan
    Gunby, Molly
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2010, 16 (04) : 231 - 240
  • [8] Project Performance Evaluation of Multi-prime Contracts in Comparison with General Contractor Contracts
    Kim, Kyungrai
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2017, 16 (03) : 613 - 618
  • [9] Contractor Firm Strategies in Delivering Green Project: A Review
    Powmya, Ayisha
    Abidin, Nazirah Zainul
    Azizi, Nurul Sakina Mokhtar
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF GLOBAL NETWORK FOR INNOVATIVE TECHNOLOGY AND AWAM INTERNATIONAL CONFERENCE IN CIVIL ENGINEERING (IGNITE-AICCE'17): SUSTAINABLE TECHNOLOGY AND PRACTICE FOR INFRASTRUCTURE AND COMMUNITY RESILIENCE, 2017, 1892
  • [10] Structural equation model for assessing impacts of contractor's performance on project success
    Doloi, Hemanta
    Iyer, K. C.
    Sawhney, Anil
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (06) : 687 - 695