A heuristic approach to n/m job shop scheduling: Fuzzy dynamic scheduling algorithms

被引:14
|
作者
Roy, U
Zhang, XY
机构
[1] Department of Mechanical, Aerospace and Manufacturing Engineering, Syracuse University, Syracuse, NY
关键词
scheduling; dynamic scheduling; fuzzy model; job shop scheduling;
D O I
10.1080/09537289608930356
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
n/m shop scheduling is a 'NP-Hard' problem. Using conventional heuristic algorithms (priority rules) only, it is almost impossible to achieve an optimal solution. Research has been carried out to improve the heuristic algorithms to give a near-optimal solution. This paper advocates a fuzzy logic based, dynamic scheduling algorithm aimed at achieving this goal. The concept of new membership functions is discussed in the algorithm as a link to connect several priority rules. The constraints to determine the membership function of jobs for a particular priority rule are established, and three membership functions are developed. In order to decide the weight vector of priority rules, an aggregate performance measure is suggested. The methodology for constructing the weight vector is discussed in detail. Experiments have been carried out using a simulation technique to validate the proposed scheduling algorithm.
引用
收藏
页码:299 / 311
页数:13
相关论文
共 50 条
  • [21] Job Shop Scheduling with Dynamic Fuzzy Selection of Dispatching Rules
    V. Subramaniam
    T. Ramesh
    G. K. Lee
    Y. S. Wong
    G. S. Hong
    [J]. The International Journal of Advanced Manufacturing Technology, 2000, 16 : 759 - 764
  • [22] Study on the job shop fuzzy dynamic scheduling based on virtual pre-scheduling
    Li, Fuming
    Zhu, Yunlong
    Yin, Chaowan
    Song, Xiaoyu
    [J]. WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 7348 - 7352
  • [23] Heuristic algorithms for job-shop scheduling problems with stochastic precedence constraints
    Neumann, K
    Schneider, WG
    [J]. ANNALS OF OPERATIONS RESEARCH, 1999, 92 (0) : 45 - 63
  • [24] Robust job shop scheduling problem: Mathematical models, exact and heuristic algorithms
    Jamili, Amin
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 55 : 341 - 350
  • [25] Heuristic algorithms for flow shop scheduling problem
    Wei, Youshuang
    Yang, Xianglong
    Feng, Yuncheng
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2000, 20 (09): : 41 - 47
  • [26] Dynamic group job shop scheduling
    Mauergauz, Yuri
    [J]. INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2015, 10 (01) : 41 - 49
  • [27] A SURVEY OF HEURISTIC RULES AND THEIR SIMULATION APPROACHES TO DYNAMIC JOB SHOP SCHEDULING PROBLEM
    Huang Zhujun
    Xiong Hegen
    [J]. PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 835 - 844
  • [28] Learning based dynamic approach to job-shop scheduling
    Liang, W
    Yu, HB
    [J]. 2001 INTERNATIONAL CONFERENCES ON INFO-TECH AND INFO-NET PROCEEDINGS, CONFERENCE A-G: INFO-TECH & INFO-NET: A KEY TO BETTER LIFE, 2001, : C274 - C279
  • [29] A DYNAMIC JOB-SHOP SCHEDULING FRAMEWORK - A BACKWARD APPROACH
    SUN, D
    LIN, L
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (04) : 967 - 985
  • [30] A new heuristic operator for job shop scheduling problems
    Zhao, Liang-hui
    Deng, Fei-qi
    [J]. 2006 10TH INTERNATIONAL CONFERENCE ON COMMUNICATION TECHNOLOGY, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1375 - +