Research on Shallow Buried and Large-Span Tunnelling Undercrossing a Highway

被引:0
|
作者
Liu, Chunyang [1 ]
Li, Jian [1 ]
Tan, Zhongsheng [1 ]
机构
[1] BeiJing Jiaotong Univ, Sch Civil Engn & Architecture, Beijing 100044, Peoples R China
来源
关键词
Shallow burying mining; Undercrossing construction; Loess tunnel; Field monitoring; construction optimization;
D O I
10.4028/www.scientific.net/AMM.90-93.1748
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
WenXiang tunnel,one of the tunnels constructed for the ZhengXi Special passenger Railway in china. In this project we have carried out a series of research on optimizing the construction method for shallow and large-span tunnels in loess condition. According to the field monitoring of ground settlement, vault settlement and primary support stress of the tunnel section before tunnelling underneath the LianHuo Highway, the result indicates that soil settlement and primary support stress can not be controlled very well, and current construction program needs to be reformed since it can not meet construction safety requirement. Our synthetical analysis comprises the optimized methods have been used in construction, such as reducing excavation area, increasing excavation steps of pilot tunnel, reserving core soil, closing invert punctually, reinforcing primary support, etc. The security and reliability also has been verified by numerial analysis sofeware FLAC(3D). From feedback of field implement and monitoring result, the effect of optimized method is significant; and all of these methods ensured this tough project implemented successfully. These results derived from our research are subject to a ceritain value that could be referred for future analogous project, in terms of controlling soil settlement and protecting surrouding building facilities.
引用
收藏
页码:1748 / 1756
页数:9
相关论文
共 50 条
  • [31] LONG-TERM BEHAVIOR OF BURIED LARGE-SPAN CULVERTS - DISCUSSION
    JOSEPH, TP
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1988, 114 (03): : 376 - 378
  • [32] Analysis of stress monitoring of a large-span highway tunnel in Hanjialing mountain
    Chen, Geng-Ye
    Liu, Bin
    Wan, Ming-Fu
    Hao, Zhe
    Li, Wei
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (SUPPL. 2): : 5509 - 5515
  • [33] Numerical Simulation of Ultra-Shallow Buried Large-Span Double-Arch Tunnel Excavated under an Expressway
    Wang, Jianxiu
    Cao, Ansheng
    Wu, Zhao
    Sun, Zhipeng
    Lin, Xiao
    Sun, Lei
    Liu, Xiaotian
    Li, Huboqiang
    Sun, Yuanwei
    APPLIED SCIENCES-BASEL, 2022, 12 (01):
  • [34] High pre-tension reinforcing technology and design for ultra-shallow buried large-span urban tunnels
    Wang, Qi
    Wei, Huayong
    Jiang, Bei
    Wang, Xuepeng
    Sun, Lingfeng
    He, Manchao
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2024, 182
  • [35] Research on influencing factors and recognition method for loose zone around shallow-buried large-span unlined tunnel in heavily jointed rock stratum
    Wang, Zhiwei
    Qiao, Chunsheng
    Song, Chaoye
    ROCK CHARACTERISATION, MODELLING AND ENGINEERING DESIGN METHODS, 2013, : 567 - 572
  • [36] Deformation Characteristics and Countermeasures of shallow and Large-span Tunnel Under-crossing the Existing Highway in Soft Soil: a Case Study
    Chengyong Cao
    Chenghua Shi
    Mingfeng Lei
    Limin Peng
    Ruxue Bai
    KSCE Journal of Civil Engineering, 2018, 22 : 3170 - 3181
  • [37] Experimental research of pipe-roof pre-supporting technology for the shallow large-span tunnel
    Tan, Zhongsheng
    Sun, Xiaojing
    Ma, Dong
    Ma, Yongchang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 : 429 - 434
  • [38] Deformation Characteristics and Countermeasures of shallow and Large-span Tunnel Under-crossing the Existing Highway in Soft Soil: a Case Study
    Cao, Chengyong
    Shi, Chenghua
    Lei, Mingfeng
    Peng, Limin
    Bai, Ruxue
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (08) : 3170 - 3181
  • [39] Analysis of large-span highway tunnel surrounding rock vertical pressure attributes
    Liu X.
    Luo R.
    Tongji Daxue Xuebao/Journal of Tongji University, 2010, 38 (12): : 1741 - 1745
  • [40] Settlement control technology for a shallow-buried large-span tunnel beneath a 110 kV high-voltage pylon
    Zhang, Ning
    Modern Tunnelling Technology, 2013, 50 (06) : 184 - 188