Airport runway scheduling

被引:123
|
作者
Bennell, Julia A. [1 ]
Mesgarpour, Mohammad [1 ]
Potts, Chris N. [1 ]
机构
[1] Univ Southampton, Sch Management, CORMSIS, Southampton SO17 1BJ, Hants, England
来源
关键词
Aircraft landing scheduling; Aircraft take-off scheduling; Runway sequencing; Review; RECEDING HORIZON CONTROL; AIRCRAFT LANDINGS; GENETIC ALGORITHM; HEATHROW; CAPACITY; TIME; AIRLINES;
D O I
10.1007/s10288-011-0172-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Airport runway optimization is an ongoing challenge for air traffic controllers. Since demand for air-transportation is predicted to increase, there is a need to realize additional take-off and landing slots through better runway scheduling. In this paper, we review the techniques and tools of operational research and management science that are used for scheduling aircraft landings and take-offs. The main solution techniques include dynamic programming, branch and bound, heuristics and meta-heuristics.
引用
收藏
页码:115 / 138
页数:24
相关论文
共 50 条
  • [41] Manchester Airport - construction of the second runway
    Jackson, C.P.
    Highways and Transportation, 1999, 46 (09):
  • [42] REEF RUNWAY IS FIRST IN AIRPORT DESIGN
    不详
    CIVIL ENGINEERING, 1978, 48 (06): : 105 - 108
  • [43] Sky Harbor Airport Runway Realignment
    Flores, Hector D.
    Twedt, Brandon J.
    UNIVERSITY OF MINNESOTA 68TH ANNUAL GEOTECHNICAL ENGINEERING CONFERENCE (GEO-CONGRESS 2020), 2020, 321 : 187 - 197
  • [44] Stochastic Runway Scheduling
    Solak, Senay
    Solveling, Gustaf
    Clarke, John-Paul B.
    Johnson, Ellis L.
    TRANSPORTATION SCIENCE, 2018, 52 (04) : 917 - 940
  • [45] Simulation of a remote runway solution for a congested airport: Mexico City Airport
    Mota M.M.
    Scala P.
    International Journal of Simulation and Process Modelling, 2019, 14 (04) : 338 - 347
  • [46] Vacuum preloading consolidation of Yaoqiang Airport runway
    Tang, M
    Shang, JQ
    GEOTECHNIQUE, 2000, 50 (06): : 613 - 623
  • [47] LA GUARDIA AIRPORT RUNWAY EXTENSION PROGRAM
    KYLE, JM
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1966, 11 (02): : 73 - &
  • [48] A Simulation Model for Airport Runway Capacity Estimation
    Zou, Xiang
    Cheng, Peng
    Cheng, Nong
    2014 IEEE 17TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2014, : 2669 - 2674
  • [49] A REVIEW ON CRACK RELIEF LAYER IN AIRPORT RUNWAY
    Zaini, Ashraf Ahmad
    Aziz, Md Maniruzzaman A.
    Kassim, Khairul Anuar
    Mustafa, Khairul Hafiz
    JURNAL TEKNOLOGI, 2016, 78 (7-2): : 41 - 48