A Novel MCDM-based Approach for Disassembly Line Balancing Problem

被引:0
|
作者
Qiang, Yuezhao [1 ]
Lin, Yu [2 ]
Tian, Guangdong [2 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Heilongjiang, Peoples R China
[2] Jilin Univ, Transportat Coll, Changchun 130022, Jilin, Peoples R China
基金
中国国家自然科学基金;
关键词
ALGORITHM;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
With the progress of industrial technology and frequent product upgrading, products are eliminated more quickly than ever before. The recovery, recycling, and refabricating of end-of-life (EOL) products are attracting more attention. Disassembly is essential to recycle and refabricate EOL products, and a disassembly line is an effective way to accomplish it. A disassembly line balancing problem (DLBP) is conducted to streamlining the disassembly process. In this paper, a novel heuristic approach combining the fuzzy set theory, grey fuzzy integral relational analysis, and a fast ranking heuristic approach is proposed to solve the DLBP. Based on the characteristics of the DLBP, an innovative MCDM method based on fuzzy set theory, grey relational analysis (GRA), and Choquet fuzzy integral is proposed to determine the optimum disassembly sequences. A fast ranking heuristic algorithm (FPCR) considering precedence and cycle time is used to assign the disassembly tasks subject to the rank derived from MCDM. The proposed approach is illustrated with an example and the results show its efficacy in solving the DLBP.
引用
收藏
页码:151 / 156
页数:6
相关论文
共 50 条
  • [31] ENUMERATIVE SEARCH ALGORITHM FOR ROBOTIC DISASSEMBLY LINE BALANCING PROBLEM
    Kanagaraj, Ganesan
    Naresh, Raju
    Yu, Vincent F.
    INTERNATIONAL JOURNAL OF ROBOTICS & AUTOMATION, 2021, 36 (01): : 35 - 43
  • [32] 2-opt heuristic for the disassembly line balancing problem
    McGovern, SM
    Gupta, SM
    ENVIRONMENTALLY CONSCIOUS MANUFACTURING III, 2004, 5262 : 71 - 84
  • [33] Mixed model disassembly line balancing problem with fuzzy goals
    Paksoy, Turan
    Gungor, Askiner
    Ozceylan, Eren
    Hancilar, Arif
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (20) : 6082 - 6096
  • [34] A network-based shortest route model for parallel disassembly line balancing problem
    Hezer, Seda
    Kara, Yakup
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (06) : 1849 - 1865
  • [35] An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
    Bentaha, Mohand Lounes
    Battaia, Olga
    Dolgui, Alexandre
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (06) : 1807 - 1818
  • [36] Hathi: An MCDM-based Approach to Capacity Planning for Cloud-hosted DBMS
    Domaschka, Jorg
    Volpert, Simon
    Seybold, Daniel
    2020 IEEE/ACM 13TH INTERNATIONAL CONFERENCE ON UTILITY AND CLOUD COMPUTING (UCC 2020), 2020, : 143 - 154
  • [37] An MCDM-based game-theoretic approach for strategy selection in higher education
    Ekinci, Yeliz
    Orbay, Benan Zeki
    Karadayi, Melis Almula
    SOCIO-ECONOMIC PLANNING SCIENCES, 2022, 81
  • [38] Implementation of MCDM-Based Integrated Approach to Identifying the Uncertainty Factors on the Constructional Project
    Bagheri, Raana
    Borouji, Zahra
    Razavian, Seyed Behnam
    Keshvari, Mohammad Mahdi
    Sharifi, Farzad
    Sharifi, Sara
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [39] A MCDM-Based Approach for Selection of a Sedan Car from Indian Car Market
    Singh, Rohit
    Rashmi
    Avikal, Shwetank
    HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 569 - 578
  • [40] A Comprehensive MCDM-Based Approach for Object-Oriented Metrics Selection Problems
    Maddeh, Mohamed
    Al-Otaibi, Shaha
    Alyahya, Sultan
    Hajjej, Fahima
    Ayouni, Sarra
    APPLIED SCIENCES-BASEL, 2023, 13 (06):