共 50 条
- [41] Foundation aspects for the load-out of 24,000-Tonne Jack-up Rig PROCEEDINGS OF THE EIGHTH INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 1998, : 375 - 383
- [42] Influence of alternative wave loading and support modeling assumptions on jack-up rig response extremes J Offshore Mech Arct Eng, Trans ASME, 2 (109-114):
- [43] The influence of alternative wave loading and support modeling assumptions on jack-up rig response extremes JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 1996, 118 (02): : 109 - 114
- [44] Lifua-A: An Enhanced Methodology for Installing a Stacked Template Structure (STS) with a Jack-Up Rig SPE - International Association of Drilling Contractors Drilling Conference Proceedings, 1600,
- [46] Combined loading of a jack-up unit CONSTITUTIVE AND CENTRIFUGE MODELLING: TWO EXTREMES, 2002, : 211 - 215
- [48] Ice loading of jack-up platforms Proceedings of the 24th International Conference on Offshore Mechanics and Arctic Engineering, Vol 2, 2005, : 913 - 917
- [50] Failure probability of a jack-up under environmental loading in the Central North Sea Marine Structures, 9 (01):