Intelligent Water Drops Algorithm on Parallel Machines Scheduling

被引:0
|
作者
Kayvanfar, Vahid [1 ]
Teymourian, Ehsan [2 ]
Alizadeh, Koorosh Mashhadi [3 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, 424 Hafez Ave, Tehran, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Bobal, Iran
[3] Sadjad Univ Technol, Dept Ind Engn, Mashhad, Iran
关键词
Makespan; Intelligent water drops (IWD); Parallel machines; Earliness and tardiness; TARDINESS PENALTIES; EARLINESS; OPTIMIZATION; TIMES; COMMON; DATE;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maximum completion time so called makespan as well as earliness and tardiness penalties are simultaneously minimized on parallel machines in this paper. An intelligent water drops (IWD) algorithm as a new swarm-based nature inspired optimization one is presented and applied to solve this problem. Experimental results show the superiority of the employed IWD method.
引用
收藏
页数:5
相关论文
共 50 条
  • [41] An Adaptive Intelligent Water Drops Algorithm for Set Covering Problem
    Crawford, Broderick
    Soto, Ricardo
    Astorga, Gino
    Lemus-Romani, Jose
    Misra, Sanjay
    Rubio, Jose-Miguel
    [J]. 2019 19TH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND ITS APPLICATIONS (ICCSA 2019), 2019, : 39 - 45
  • [42] Hybrid intelligent water Drops algorithm for examination timetabling problem
    Aldeeb, Bashar A.
    Al-Betar, Mohammed Azmi
    Norwawi, Norita Md
    Alissa, Khalid A.
    Alsmadi, Mutasem K.
    Hazaymeh, Ayman A.
    Alzaqebah, Malek
    [J]. JOURNAL OF KING SAUD UNIVERSITY-COMPUTER AND INFORMATION SCIENCES, 2022, 34 (08) : 4847 - 4859
  • [43] Setup Planning Method Based on Intelligent Water Drops Algorithm
    Gao B.
    Hu X.
    Peng Z.
    Liu J.
    [J]. Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2019, 30 (21): : 2539 - 2545
  • [44] Improved intelligent water drops algorithm using adaptive schema
    Msallam, Mohammed M.
    Hamdan, Mohammad
    [J]. INTERNATIONAL JOURNAL OF BIO-INSPIRED COMPUTATION, 2011, 3 (02) : 103 - 111
  • [45] Why the Intelligent Water Drops Cannot Be Considered as a Novel Algorithm
    Camacho-Villalon, Christian Leonardo
    Dorigo, Marco
    Stutzle, Thomas
    [J]. SWARM INTELLIGENCE (ANTS 2018), 2018, 11172 : 302 - 314
  • [46] A hybrid intelligent algorithm for a fuzzy multi-objective job shop scheduling problem with reentrant workflows and parallel machines
    Basiri, Mohammad-Ali
    Alinezhad, Esmaeil
    Tavakkoli-Moghaddam, Reza
    Shahsavari-Poure, Nasser
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 39 (05) : 7769 - 7785
  • [47] Task scheduling using memetic intelligent water drops algorithm based on tabu search: a case study on azure workflows
    Alireza Sadeghi Hesar
    [J]. Soft Computing, 2023, 27 : 10647 - 10663
  • [48] Task scheduling using memetic intelligent water drops algorithm based on tabu search: a case study on azure workflows
    Hesar, Alireza Sadeghi
    [J]. SOFT COMPUTING, 2023, 27 (15) : 10647 - 10663
  • [49] A new genetic algorithm in solving the unrelated parallel machines scheduling problem
    Chen, L
    Gao, JM
    [J]. THIRD INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE ENGINEERING: DIGITAL ENTERPRISES AND NONTRADITIONAL INDUSTRIALIZATION, 2003, : 154 - 156
  • [50] Genetic algorithm for scheduling reentrant jobs on parallel machines with a remote server
    Wang H.
    Li H.
    Zhao Y.
    Lin D.
    Li J.
    [J]. Transactions of Tianjin University, 2013, 19 (06) : 463 - 469