共 50 条
- [41] Disturbance recording in IEC 61850 substation automation systems 2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 921 - 926
- [43] Analysis on cascading failures of substation automation system based on IEC 61850 Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2013, 37 (02): : 61 - 66
- [44] A study on the communication test of substation automation system based on IEC 61850 Transactions of the Korean Institute of Electrical Engineers, 2008, 57 (01): : 14 - 19
- [45] Application of Iec61850 in Substation Automation System 2008 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION, VOLS 1 AND 2, 2009, : 505 - +
- [46] A Conceptual Design of IED Testing System with IEC 61850-based Functional Specifications Common to Multiple Utilities 2019 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2019,
- [47] Process Bus Network Flow Modeling for Protective Relaying Testing in IEC 61850-Based Substation 2018 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2018,
- [48] Data modeling for substation SCADA system based on IEC 61850 standard Dianli Xitong Zidonghue, 2006, 5 (43-48):
- [49] Gigabit Ethernet Based Substation under IEC61850 standard 2009 2ND INTERNATIONAL CONFERENCE ON COMPUTER, CONTROL AND COMMUNICATION, 2009, : 222 - +
- [50] Testing of IEC 61850 sampled values based digital substation automation systems JOURNAL OF ENGINEERING-JOE, 2018, (15): : 807 - 811