共 50 条
- [32] A note on minimizing total weighted completion time with an unexpected machine unavailable interval Journal of Scheduling, 2019, 22 : 255 - 262
- [34] Minimizing the total weighted completion time on a single machine under linear deterioration The International Journal of Advanced Manufacturing Technology, 2007, 33 : 1237 - 1243
- [35] Minimizing the total weighted completion time on a single machine under linear deterioration INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 33 (11-12): : 1237 - 1243
- [39] Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs Journal of Scheduling, 2010, 13 : 561 - 576