Kula Belgrade - Part 2 - Specifics of construction of Kula structure

被引:0
|
作者
Miljkovic, Nemanja [1 ]
Milicevic, Mladen [1 ]
Ristic, Svetlana [1 ]
Popovic, Darko [1 ]
Alendar, Vanja [1 ]
机构
[1] Co DNEC Doo, Belgrade, Serbia
关键词
Tall building construction; Piles empty set1200mm; Osterberg cell test; Raft concreting in volume of 4750m(3); Construction of transfer structure; Construction of PT slabsY;
D O I
10.5937/GRMK2201023M
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Kula Belgrade is the tallest building within the Belgrade Waterfront Project located on the right bank of the Sava River. It is envisaged as the future landmark of Belgrade and the pivotal point of Belgrade Waterfront development. It consists of a 168m high - 42 storey tower, a podium and an eccentric basement. It is one of the rare towers in the world in which the bottom and the top parts are mutually rotated by 90 degrees in plan and where such a transition is achieved through 7 floors - a configuration that imposes significant demands to the structure. While the 1st part of the article addressed specific topics related to design, this 2nd part is about the specific topics related to the construction of Kula Belgrade's structure, including the enabling works, construction, and testing program of piles that comprised various types of tests, including the static compression test by Osterberg cell at two tower piles with a 1200 mm diameter. The article also addresses the construction of foundations, which included the concreting of a raft under the tower in volume of 4750m(3) cast in one turn, the execution of core walls in jump form, the distinctive transfer structure and PT slabs.
引用
收藏
页码:23 / 35
页数:13
相关论文
共 50 条
  • [41] Design of stone masonry bridges in European treatises: part 2 - the construction process
    Leon, Javier
    Orfeo, Benedetta
    Todisco, Leonardo
    Miner, Patrick
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2023,
  • [42] Part 2: pushing the envelope. A process perspective for architecture, engineering and construction
    Soar, Rupert
    INTELLIGENT BUILDINGS INTERNATIONAL, 2016, 8 (02) : 90 - 105
  • [43] A MEANING OF DIAGNOSIS TO THE PATIENT'S IDENTITY. PART 2: CONSTRUCTION OR RECOGNITION?
    Dyga, Krzysztof
    Opoczynska, Malgorzata
    PSYCHOTERAPIA, 2015, (03): : 87 - 97
  • [44] Digitization techniques for integrated construction and maintenance of infrastructure - Part 2: Engineering application
    Zhu, Hehua
    Li, Xiaojun
    Chen, Xueqin
    Chen, Airong
    Ling, Jianming
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 (06): : 114 - 121
  • [45] Binders alternative to Portland cement and waste management for sustainable construction - Part 2
    Coppola, Luigi
    Bellezze, Tiziano
    Belli, Alberto
    Bignozzi, Maria C.
    Bolzoni, Fabio
    Brenna, Andrea
    Cabrini, Marina
    Candamano, Sebastiano
    Cappai, Marta
    Caputo, Domenico
    Carsana, Maddalena
    Casnedi, Ludovica
    Cioffi, Raffaele
    Cocco, Ombretta
    Coffetti, Denny
    Colangelo, Francesco
    Coppola, Bartolomeo
    Corinaldesi, Valeria
    Crea, Fortunato
    Crotti, Elena
    Daniele, Valeria
    De Gisi, Sabino
    Delogu, Francesco
    Diamanti, Maria V.
    Di Maio, Luciano
    Di Mundo, Rosa
    Di Palma, Luca
    Donnini, Jacopo
    Farina, Ilenia
    Ferone, Claudio
    Frontera, Patrizia
    Gastaldi, Matteo
    Giosue, Chiara
    Incarnato, Loredana
    Liguori, Barbara
    Lollini, Federica
    Lorenzi, Sergio
    Manzi, Stefania
    Marino, Ottavio
    Marroccoli, Milena
    Mascolo, Maria C.
    Mavilia, Letterio
    Mazzoli, Alida
    Medici, Franco
    Meloni, Paola
    Merlonetti, Glauco
    Mobili, Alessandra
    Notarnicola, Michele
    Ormellese, Marco
    Pastore, Tommaso
    JOURNAL OF APPLIED BIOMATERIALS & FUNCTIONAL MATERIALS, 2018, 16 (04): : 207 - 221
  • [46] The canal bridge across the elbe - Part 2: design and construction of the approaching bridge
    Meyer, H.
    He, S.
    Stahlbau, 2001, 70 (07) : 425 - 428
  • [47] Machine for construction of an artificial perched watertable, part 2: Improved sand gun
    Guo, G
    Araya, K
    Yoshida, M
    Shibutani, Y
    Zhang, H
    BIOSYSTEMS ENGINEERING, 2004, 87 (02) : 155 - 165
  • [48] Gates and Drives of the Greifswald Flood Barrier - Contemporary steel construction for Hydraulic Gates. Part 2: Construction Process
    Heyder, Frank
    Hohberg, Andreas
    Lettner, Christian
    STAHLBAU, 2017, 86 (01) : 27 - 35
  • [49] Construction of quality-assured infant feeding process of care data repositories: Construction of the perinatal repository (Part 2)
    Garcia-de-Leon-Chocano, Ricardo
    Munoz-Soler, Veronica
    Saez, Carlos
    Garcia-de-Leon-Gonzalez, Ricardo
    Garcia-Gomez, Juan M.
    COMPUTERS IN BIOLOGY AND MEDICINE, 2016, 71 : 214 - 222
  • [50] MACROZAMIN .2. THE ALIPHATIC AZOXY STRUCTURE OF THE AGLYCONE PART
    LANGLEY, BW
    LYTHGOE, B
    RIGGS, NV
    JOURNAL OF THE CHEMICAL SOCIETY, 1951, (SEP): : 2309 - 2316