The Real Option Value of Renegotiation in Public-Private Partnerships

被引:55
|
作者
Xiong, Wei [1 ]
Zhang, Xueqing [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Kowloon, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
Public-private partnerships; Renegotiation; Real options; Contracting; INCOMPLETE CONTRACTS; TRANSACTION COSTS; INFRASTRUCTURE; OWNERSHIP; CONCESSIONS; PROJECTS; RISK; GAME;
D O I
10.1061/(ASCE)CO.1943-7862.0001130
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Public-private partnerships (PPP) are contracts with a long-lasting period, huge relationship-specific investment, and great uncertainties. In many PPP projects, it is difficult or even impossible to write a complete contract that specifies all contingencies, so a renegotiation-allowed contract could be better than a renegotiation-proof one. Under a renegotiation-allowed PPP agreement, renegotiations can significantly influence the interests of both the private party and the government, so they have to evaluate the benefit and cost of renegotiations ex ante and consider them in the tender price. This study considers renegotiations as real options that are embodied to provide flexibilities for PPP contracts, and develops a model to capture the value of renegotiation based on real option theory. The model is proposed in three steps, including modeling underlying risk, bargaining renegotiation payoffs, and determining real option value. An illustration case is presented to demonstrate the applicability of the model. The case study shows that if a renegotiation-allowed contract is used, then (1)contractor-led renegotiation is very likely to occur, especially at the early stage of concession while government-led renegotiation is less likely to occur, and if any, it should occur at the middle stage of concession; (2)one party could use opportunistic renegotiation to hold the other party up and ask for excessive compensation, so renegotiations must be regulated; and (3)renegotiation in a PPP project may have a huge real option value, and the higher the uncertainty, the higher the renegotiation value.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Privatization and public-private partnerships
    London, R
    PUBLIC ADMINISTRATION REVIEW, 2002, 62 (01) : 118 - 123
  • [42] Public-private policy partnerships
    Twombly, EC
    NONPROFIT AND VOLUNTARY SECTOR QUARTERLY, 2003, 32 (03) : 477 - 481
  • [43] Public-Private Partnerships in China
    Wang, Mei
    PUBLIC ADMINISTRATION REVIEW, 2013, 73 (02) : 311 - 312
  • [44] PUBLIC-PRIVATE PARTNERSHIPS FOR THE UNEMPLOYED
    Sol, Els
    EUROPEAN JOURNAL OF SOCIAL SECURITY, 2010, 12 (01) : 41 - 59
  • [45] Public-private partnerships for health
    Ratzan, Scott C.
    JOURNAL OF HEALTH COMMUNICATION, 2007, 12 (04) : 315 - 316
  • [46] Ebola: Public-private partnerships
    Reperant, L. A.
    de Burgwal, L. H. M. van
    Claassen, E.
    Osterhaus, A. D. M. E.
    SCIENCE, 2014, 346 (6208) : 433 - 434
  • [47] Evaluating public-private partnerships
    Landers, Jay
    Public Works, 2004, 135 (11): : 38 - 40
  • [48] Public-private policy partnerships
    London, R
    PUBLIC ADMINISTRATION REVIEW, 2002, 62 (01) : 118 - 123
  • [49] The economics of public-private partnerships
    de Bettignies, JE
    Ross, TW
    CANADIAN PUBLIC POLICY-ANALYSE DE POLITIQUES, 2004, 30 (02): : 135 - 154
  • [50] DEFAULT AND RENEGOTIATION IN PUBLIC-PRIVATE PARTNERSHIP AUCTIONS
    Menezes, Flavio
    Ryan, Matthew
    JOURNAL OF PUBLIC ECONOMIC THEORY, 2015, 17 (01) : 49 - 77