共 50 条
- [41] An Improved Genetic Algorithm for a Parallel Machine Scheduling Problem with Energy Consideration 2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 1487 - 1492
- [42] An investigation into yard crane scheduling based on hybrid parallel genetic algorithm ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1137 - 1143
- [43] A hybrid genetic algorithm for parallel machine scheduling problem with consumable resources 2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2013, : 143 - 148
- [45] A strategy for yard crane scheduling based on hybrid parallel genetic algorithm KAM: 2008 INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING, PROCEEDINGS, 2008, : 678 - 683
- [46] AGV adaptive cluster scheduling based on genetic algorithm with parallel search Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2022, 50 (05): : 123 - 129
- [48] Solving flow shop scheduling problem using a parallel genetic algorithm FIRST WORLD CONFERENCE ON INNOVATION AND COMPUTER SCIENCES (INSODE 2011), 2012, 1 : 351 - 355
- [49] A guide for genetic algorithm based on parallel machine scheduling and flexible job-shop scheduling WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BEM-2012), 2012, 62 : 817 - 823
- [50] A parallel algorithm for production scheduling MANAGEMENT AND CONTROL OF PRODUCTION AND LOGISTICS, VOL 1 AND 2, 1998, : 321 - 325