A parallel composite genetic algorithm for mine scheduling

被引:0
|
作者
Lindon, LF [1 ]
Goforth, D [1 ]
van Wageningen, A [1 ]
Dunn, P [1 ]
Cameron, C [1 ]
Muldowney, D [1 ]
机构
[1] Laurentian Univ, MIRARCO, Sudbury, ON P3E 2C6, Canada
关键词
genetic algorithm; parallel algorithm; village; scheduling; optimization; diversity;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Mine scheduling is a multi-objective highly constrained optimization problem. Often months are spent by mine planners to achieve one feasible ore production solution. In order to assist in the process and to present alternatives with a higher likelihood of optimality, a parallel genetic algorithm for long-term scheduling of underground mines is developed. For the mine scheduling problems considered, a 2-dimensional map, of stopes is given, along with the mineral properties of each. It is required to schedule the extraction sequence of the ore from the slopes to meet the mine's objectives. The appropriateness of a schedule is determined by applying a fitness function. The fitness function assesses how well the schedule meets objectives and satisfies given constraints. In practice, the scheduling problem is simplified in order to obtain a solution in given time bounds. By modularizing the problem and employing a parallel algorithm with minimal communication requirements, a higher quality mine schedule may be found in given time bounds.
引用
收藏
页码:245 / 250
页数:6
相关论文
共 50 条
  • [41] An Improved Genetic Algorithm for a Parallel Machine Scheduling Problem with Energy Consideration
    Lu, Hong
    Qiao, Fei
    2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 1487 - 1492
  • [42] An investigation into yard crane scheduling based on hybrid parallel genetic algorithm
    Huang, Youfang
    Chang, Daofang
    He, Junliang
    Mi, Weijian
    Yan, Wei
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1137 - 1143
  • [43] A hybrid genetic algorithm for parallel machine scheduling problem with consumable resources
    Belkaid, F.
    Sari, Z.
    Yalaoui, F.
    2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2013, : 143 - 148
  • [44] Genetic Algorithm for Scheduling Reentrant Jobs on Parallel Machines with a Remote Server
    王宏
    李海娟
    赵月
    林丹
    李建武
    Transactions of Tianjin University, 2013, (06) : 463 - 469
  • [45] A strategy for yard crane scheduling based on hybrid parallel genetic algorithm
    He, Junliang
    Chang, Daofang
    Mi, Weijian
    Yan, Wei
    KAM: 2008 INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING, PROCEEDINGS, 2008, : 678 - 683
  • [46] AGV adaptive cluster scheduling based on genetic algorithm with parallel search
    Guo P.
    Wang S.
    Zhou S.
    Shi H.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2022, 50 (05): : 123 - 129
  • [47] Scheduling the parallel Kalman algorithm onto multiprocessor systems - a genetic approach
    Vaidehi, V
    Krishnan, CN
    CONTROL ENGINEERING PRACTICE, 1998, 6 (02) : 209 - 218
  • [48] Solving flow shop scheduling problem using a parallel genetic algorithm
    Akhshabi, Mostafa
    Haddadnia, Javad
    Akhshabi, Mohammad
    FIRST WORLD CONFERENCE ON INNOVATION AND COMPUTER SCIENCES (INSODE 2011), 2012, 1 : 351 - 355
  • [49] A guide for genetic algorithm based on parallel machine scheduling and flexible job-shop scheduling
    Ak, Bilgesu
    Koc, Erdem
    WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BEM-2012), 2012, 62 : 817 - 823
  • [50] A parallel algorithm for production scheduling
    Ribeiro, JFF
    Ribeiro, CM
    de Oliveira, MMB
    MANAGEMENT AND CONTROL OF PRODUCTION AND LOGISTICS, VOL 1 AND 2, 1998, : 321 - 325