Criteria for Cutting Head Clogging Occurrence during Slurry Shield Tunneling

被引:21
|
作者
Li, Xinggao [1 ,2 ]
Yang, Yi [1 ,2 ]
Li, Xingchun [3 ]
Liu, Hongzhi [4 ]
机构
[1] Beijing Jiaotong Univ, Educ Minist, Key Lab Urban Underground Engn, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
[3] Wuyi Univ, Fac Intelligent Mfg, Jiangmen 529020, Peoples R China
[4] CCCC Tunnel Engn Co Ltd, Beijing 100102, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 03期
关键词
slurry shield tunneling; cutting head clogging; driving parameters; criterion; ADHESION; CLAY; SOILS; ROCK;
D O I
10.3390/app12031001
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Cutting head clogging is more frequently encountered as more tunnels are being excavated by slurry shield machines. So establishing criteria for cutting head clogging occurrence based on the machine driving parameters is of great engineering significance. Three construction cases of the Beijing south-to-north water diversion auxiliary project, the Jinan Huanghe River Crossing tunnel construction, and the Wuhan Metro Line 8 Yangtze River Crossing tunnel construction, are introduced. Development of the main driving parameters in the construction cases, including the total thrust, the cutting head torque, the advance rate, and the cutting head rotation speed of the tunneling machines before, during, and after the cutting head clogging, are presented and analyzed. The fact is that the total thrust and the cutting head torque of tunneling machines will increase, or will not, once the cutting head clogging occurs. It is recommended to take two combined parameters of total thrust/penetration depth and cutting head torque/penetration depth into account to judge whether the cutting head clogging will occur or not. The maximum increases of the composite parameters by 2-6 times are found in the construction cases. But for the minimum increase, a 30-50% increase of the composite parameter should be noted. The findings can be of great help for similar projects.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Three-dimensional numerical modelling of slurry shield tunneling
    Swoboda, G
    Mansour, M
    TUNNEL BORING MACHINES: TRENDS IN DESIGN & CONSTRUCTION OF MECHANIZED TUNNELLING, 1996, : 27 - 41
  • [32] Study on parallel numerical simulation of slurry shield tunneling process
    Shen, Jian-Qi
    Jin, Xian-Long
    Wang, Ji-Yun
    Jisuan Lixue Xuebao/Chinese Journal of Computational Mechanics, 2010, 27 (01): : 132 - 138
  • [33] Ground settlements induced by slurry shield tunneling in stratified soils
    Ata, AA
    NORTH AMERICAN TUNNELING '96, VOLS 1 AND 2, 1996, : 43 - 50
  • [34] Numerical simulation of cutterhead and soil interaction in slurry shield tunneling
    Shen, Jianqi
    Jin, Xianlong
    Li, Yun
    Wang, Jiyun
    ENGINEERING COMPUTATIONS, 2009, 26 (7-8) : 985 - 1005
  • [35] Slurry shield tunneling in siltstones and cobble stones: Australian experience
    Balasubramaniam, B
    DiFrancesco, C
    INTERNATIONAL NO-DIG '96 - INTERNATIONAL CONFERENCE AND EXHIBITION OF TRENCHLESS TECHNOLOGY: TRENCHLESS SOUNDS THE RIGHT NOTE, 1996, : 249 - 270
  • [36] Metal-soil interface adhesion in clay clogging during shield tunneling: Theoretical model and experimental validation
    Fang, Yong
    Zhuo, Bin
    Wang, Yubo
    Luo, Hu
    Sun, Junfeng
    Yao, Yuxiang
    UNDERGROUND SPACE, 2024, 15 : 188 - 202
  • [37] Development and experiment study on seawater-based slurry for subsea tunnels in slurry shield tunneling
    Yang, Yinzun
    Yuan, Dajun
    Jin, Dalong
    Yi, Yongqiang
    CONSTRUCTION AND BUILDING MATERIALS, 2024, 451
  • [38] Risk Analysis and Countermeasures of Nanjing Yangtze River Tunnel During Large Diameter Slurry Shield Tunneling
    Yuan, Dajun
    Huang, Qingfei
    Wang, Yin
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 190 - 193
  • [39] Spatial distribution of excess pore water pressure and slurry infiltration zone in slurry shield tunneling
    Yang, Yinzun
    Jin, Dalong
    Yuan, Dajun
    Yao, Zhanhu
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 153
  • [40] WEAR CHARACTERISTICS OF SLURRY PUMP PARTS AT SHIELD TUNNELING WORK.
    Muro, Tatsuro
    Fukagawa, Ryoichi
    Doboku Gakkai Rombun-Hokokushu/Proceedings of the Japan Society of Civil Engineers, 1984, (352 /III-2): : 197 - 205