共 50 条
- [1] A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling Journal of Intelligent Manufacturing, 2009, 20 : 683 - 694
- [2] Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops The International Journal of Advanced Manufacturing Technology, 2015, 77 : 173 - 185
- [3] Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4): : 173 - 185
- [5] Scheduling sequence-dependent setup time job shops with preventive maintenance The International Journal of Advanced Manufacturing Technology, 2009, 43 : 170 - 181
- [6] Scheduling sequence-dependent setup time job shops with preventive maintenance INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 170 - 181
- [7] A study on simulation-based optimization of a stochastic flexible job shop scheduling undergoing preventive maintenance with sequence-dependent setup time INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2023,
- [10] Scheduling flexible flow shops with sequence-dependent setup effect PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 1757 - 1762