共 50 条
- [21] COMPARISON BETWEEN JUST-IN-TIME AND EOQ-SYSTEM ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1990, 18 (03): : 233 - 240
- [22] ITS UP TO SYSTEM INTEGRATORS TO IMPLEMENT JUST-IN-TIME MINI-MICRO SYSTEMS, 1987, 20 (02): : 46 - 47
- [23] A Case Study of Just-In-Time System in Service Industry 12TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT (GCMM - 2014), 2014, 97 : 2232 - 2237
- [24] A COMPARISON OF MODIFIED JUST-IN-TIME PRODUCTION SYSTEM WITH CONWIP 8TH INTERNATIONAL INDUSTRIAL SIMULATION CONFERENCE 2010, ISC 2010, 2010, : 75 - 79
- [27] LOADING STRATEGIES FOR A CLASS OF JUST-IN-TIME MANUFACTURING SYSTEM INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1995, 10 (01): : 46 - 51
- [28] Loading strategies for a class of just-in-time manufacturing system Int J Adv Manuf Technol, 1 (46-51):
- [29] Just-in-time information delivery system for passenger assistance Q Rep RTRI (Jpn), 2006, 4 (187-191):