共 50 条
- [42] Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan Annals of Operations Research, 2004, 129 : 171 - 185
- [43] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2010, 8 (01): : 87 - 99
- [48] Two-machine interval shop scheduling with time lags Journal of Scheduling, 2015, 18 : 359 - 368