共 50 条
- [2] Two-machine Shop Scheduling with Two Agents and Linear Deteriorating Jobs 2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 1154 - 1159
- [5] A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints Optimization Letters, 2011, 5 : 183 - 190