California extended-reach project approved

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:36 / &
页数:2
相关论文
共 50 条
  • [41] A study on the stability of the borehole in shale, in extended-reach drilling
    Yu, Baohua
    Yan, Chuanliang
    Gao, Deli
    Li, Jinxiang
    [J]. CMES - Computer Modeling in Engineering and Sciences, 2013, 89 (01): : 57 - 78
  • [42] Casing-running challenges for extended-reach wells
    [J]. JPT, Journal of Petroleum Technology, 2004, 56 (07): : 59 - 60
  • [43] Research Progress of Extended-Reach Well Antifriction Technology
    Zhang, Huizeng
    Guan, Zhichuan
    Xu, Yuqiang
    Li, Qiandeng
    Xuan, Lingchao
    [J]. EXPLORATION AND PROCESSING OF MINERAL RESOURCES, 2014, 868 : 638 - +
  • [44] TORQUE AND DRAG - 2 FACTORS IN EXTENDED-REACH DRILLING
    AARRESTAD, TV
    BLIKRA, H
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1994, 46 (09): : 800 - 803
  • [45] Secret of world-class extended-reach drilling
    Anon
    [J]. JPT, Journal of Petroleum Technology, 2000, 52 (06): : 41 - 43
  • [46] Solid expandable tubulars for constructing extended-reach wells
    Denney, D
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (07): : 62 - 64
  • [47] Casing-running challenges for extended-reach wells
    Bybee, K
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (07): : 59 - 60
  • [48] Purpose-built drillpipe for extended-reach drilling
    不详
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1998, 50 (05): : 70 - +
  • [49] Extended-reach drilling extends life of CNOOC field
    Wei, Hong An
    Tang, Hai Xiong
    [J]. Oil and Gas Journal, 2005, 103 (29): : 35 - 37
  • [50] Extended-Reach Stimulation With Coiled Tubing: A Case Study
    [J]. 1600, Society of Petroleum Engineers (SPE) (55):