Interval-parameter robust quadratic programming for water quality management under uncertainty

被引:26
|
作者
Li, Y. P. [1 ]
Huang, G. H. [2 ]
Nie, S. L. [3 ]
Mo, D. W. [1 ]
机构
[1] Peking Univ, Coll Urban & Environm Sci, Beijing 100871, Peoples R China
[2] Univ Regina, Fac Engn, Regina, SK S4S OA2, Canada
[3] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
关键词
decision making; environment; fuzzy sets; interval analysis; quadratic optimization; robust programming; uncertainty; water quality;
D O I
10.1080/03052150801918347
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Effective planning of water quality management is important for facilitating sustainable socio-economic development in watershed systems. An interval-parameter robust quadratic programming (IRQP) method is developed by incorporating techniques of robust programming and interval quadratic programming within a general optimization framework. The IRQP improves upon existing quadratic programming methods, and can tackle uncertainties presented as interval numbers and fuzzy sets as well as their combinations. Moreover, it can deal with nonlinearities in the objective function such that economies-of-scale effects can be reflected. The developed method is applied to a case study of a water quality management under uncertainty. A number of decision alternatives are generated based on the interval solutions as well as the projected applicable conditions. They represent multiple decision options with various environmental and economic considerations. Willingness to accept a low economic revenue will guarantee satisfying the water quality requirements. A strong desire to acquire a high benefit will run the risk of violating environmental criteria.
引用
收藏
页码:613 / 635
页数:23
相关论文
共 50 条
  • [31] An interval-parameter two-stage stochastic integer programming model for environmental systems planning under uncertainty
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Nie, X. H.
    Maqsood, I.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (04) : 461 - 483
  • [32] An Interval-Parameter Chance-Constraint Mixed-Integer Programming for Energy Systems Planning Under Uncertainty
    Huang, G. H.
    Niu, Y. T.
    Lin, Q. G.
    Zhang, X. X.
    Yang, Y. P.
    [J]. ENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY, 2011, 6 (02) : 192 - 205
  • [33] Optimal Water Resources Planning Based on Interval-parameter Two-stage Robust Stochastic Programming Model
    Chen H.
    Wang Q.
    Li X.
    Wang Z.
    Li C.
    [J]. Nongye Jixie Xuebao/Transactions of the Chinese Society for Agricultural Machinery, 2019, 50 (03): : 271 - 280
  • [34] Two-Stage Interval-Parameter Stochastic Programming Model Based on Adaptive Water Resource Management
    Fu, Qiang
    Zhao, Ke
    Liu, Dong
    Jiang, Qiuxiang
    Li, Tianxiao
    Zhu, Changhong
    [J]. WATER RESOURCES MANAGEMENT, 2016, 30 (06) : 2097 - 2109
  • [35] Two-Stage Interval-Parameter Stochastic Programming Model Based on Adaptive Water Resource Management
    Qiang Fu
    Ke Zhao
    Dong Liu
    Qiuxiang Jiang
    Tianxiao Li
    Changhong Zhu
    [J]. Water Resources Management, 2016, 30 : 2097 - 2109
  • [36] Interval-parameter bi-level programming for energy system management under uncertainty: Towards a deep-decarbonized and sustainable future in China
    Gong, J. W.
    Li, Y. P.
    Huang, G. H.
    Li, Y. F.
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2022, 87
  • [37] Development of a Fuzzy-Boundary Interval Programming Method for Water Quality Management Under Uncertainty
    Liu, J.
    Li, Y. P.
    Huang, G. H.
    Nie, S.
    [J]. WATER RESOURCES MANAGEMENT, 2015, 29 (04) : 1169 - 1191
  • [38] Development of a Fuzzy-Boundary Interval Programming Method for Water Quality Management Under Uncertainty
    J. Liu
    Y. P. Li
    G. H. Huang
    S. Nie
    [J]. Water Resources Management, 2015, 29 : 1169 - 1191
  • [39] IF-EM: An Interval-Parameter Fuzzy Linear Programming Model for Environment-Oriented Evacuation Planning under Uncertainty
    Tan, Qian
    Huang, Guo H.
    Wu, Chaozhong
    Cai, Yanpeng
    [J]. JOURNAL OF ADVANCED TRANSPORTATION, 2011, 45 (04) : 286 - 303
  • [40] A hybrid interval-parameter fuzzy robust programming method and its application to filter management strategy in fluid power systems
    Nie, S. L.
    Ji, H.
    Huang, Y. Q.
    Li, Y. P.
    Huang, G. H.
    [J]. ENGINEERING OPTIMIZATION, 2014, 46 (01) : 15 - 38