Construction technology for a shallow-buried underwater interchange tunnel with a large span

被引:25
|
作者
Shi, Chenghua [1 ]
Cao, Chengyong [1 ]
Lei, Mingfeng [1 ]
机构
[1] Cent S Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China
关键词
Underwater tunnel; Ultra-shallow-buried; Large span; Interchange; Construction technology; SUBSEA TUNNEL; NUMERICAL-ANALYSES; WATER INFLOW; STABILITY; ZONES;
D O I
10.1016/j.tust.2017.09.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction of underwater tunnels has become a major method for enabling transportation across rivers in cities. In this paper, several innovative ideas and methods adopted in the construction of the Yingpan Road Underwater Tunnel in Changsha, China were introduced. On the basis of the crossing function of traditional underwater tunnels, an underground interchange tunnel was designed, which could effectively overcome the bottleneck of regional transportation in cities and significantly expand the traffic function of tunnels. A method for determining the minimum burial depth of underwater tunnels was proposed by considering reinforcement control measures. This method indicated that the minimum burial depth of the Yingpan Road Tunnel was 11.5 m, which was shallower by over 5 m compared with existing data calculated using other methods. The tunnel length was also shorter by 400 m, which enhanced the traffic evacuation function of the tunnel. Seepage quantity in the tunnel during the service periods could be remarkably reduced by adjusting the thickness of the grouting reinforcement loop and the reinforcing parameters. By adopting advanced full-face pre-reinforcement and preliminary supports with double-layer steel and reasonably organising benching excavation, an ultra shallow-buried large-section underwater tunnel with a depth/span ratio of only 0.46 and an excavation area of 376 m(2) was successfully excavated. The multi-operation and multi-section difficulties in constructing underwater super-large-section tunnels were overcome.
引用
收藏
页码:317 / 329
页数:13
相关论文
共 50 条
  • [21] Numerical Simulation for Construction Process Large-span Flat Tunnel Under the Condition of Shallow Buried
    Li, JunJie
    Tuo, Li
    Zhang, GuanJun
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1100 - 1104
  • [22] Model Test Research on Excavation Method of Large-span and Shallow-buried Bias Tunnel in Cobble and Gravelly Soil Layer
    Tang Jinsong
    Xiong Baolin
    Liu Chiguang
    [J]. PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 336 - 343
  • [23] Study on the influence of construction of shallow-buried underground excavation tunnel on adjacent framework buildings
    Wei, Gang
    Hu, Huihui
    Zhang, Shimin
    [J]. DISASTER ADVANCES, 2013, 6 : 149 - 156
  • [24] Optimization and analysis of blasting construction of shallow-buried tunnel with small clear spacing in city
    Wu, Bo
    Lan, Yangbin
    Yang, Shisheng
    Wang, Shuaishuai
    Dai, Yichang
    [J]. Journal of Railway Science and Engineering, 2020, 17 (05) : 1201 - 1208
  • [25] Monitoring and controlling technology for blasting vibration induced by a shallow-buried tunnel in a complex environment
    College of Architecture and Civil Engineering, Shandong University of Science and Technology, Qingdao 266590, China
    不详
    [J]. Mod. Tunn. Technol., 2013, 3 (142-146):
  • [26] Research of design and construction key technology of underwater tunnel interchange segment
    Zhang Xian-feng
    [J]. ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1647 - 1652
  • [27] Construction techniques for a shallow-buried long-span highway tunnel in soft soil passing under the subgrade of an existing railway station
    Zhao, Licai
    [J]. Modern Tunnelling Technology, 2014, 51 (06) : 160 - 166
  • [28] Analysis of deformation and spatio–temporal effects during construction of a shallow-buried large cross-sectional loess tunnel
    Zhongsheng Tan
    Jinpeng Zhao
    Xiaolong Guo
    [J]. Arabian Journal of Geosciences, 2021, 14 (22)
  • [29] Ground subsidence characteristics caused by construction of shallow-buried tunnel in a sandy soil composite formation
    Zhang, Peng
    Pan, Yajing
    Yu, Zhaocheng
    Guan, Xiaoming
    Wang, Gang
    An, Jianyong
    Lei, Haibo
    [J]. ARABIAN JOURNAL OF GEOSCIENCES, 2020, 13 (18)
  • [30] Mechanical Characteristics of Primary Support System at Construction Phase in Shallow-Buried Super-Large-Span Four-Line High-Speed Railway Tunnel
    Liu, Xiabing
    He, Shaohui
    Wang, Dahai
    Zhang, Jun
    Yao, Wenbo
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (06): : 90 - 102