Design and Construction of the South Hartford CSO Tunnel

被引:0
|
作者
Sullivan, James [1 ]
Perham, Andrew [2 ]
机构
[1] AECOM, 500 Enterprise Dr, Rocky Hill, CT 06067 USA
[2] Metropolitan Dist, 555 Main St,POB 800, Hartford, CT 06142 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The South Hartford CSO Tunnel (South Tunnel) project is a significant component of the Metropolitan District's SSO/CSO control program in Hartford, CT. The South Tunnel is a 4-mi. -long, 18-ft internal diameter wet weather tunnel that will eliminate sanitary sewer overflows (SSOs) and control combined sewer overflows (CSOs). Sewer diversion structures will be constructed at each CSO and SSO to replicate or intercept overflows and divert them to near-surface consolidation sewers. These consolidation sewers will in turn, discharge to one of eight hydraulic tangential vortex drop shafts which will convey the flow to the deep rock tunnel. Once in the tunnel, the sewer overflows will be stored and then pumped to receive proper treatment. The project was split into five construction contracts totalling approximately $410 MM. Advanced utility relocation and electrical upgrades have been completed. Construction of the deep rock tunnel, shafts, and deep rock connector tunnels are underway. The 35-ft diameter launch shaft has been excavated. The 70-ft diameter pump station shaft has been excavated to 80 ft below grade. The tunnel boring machine (TBM) has arrived onsite and is being assembled. By July 2018, the launch shaft, pump station shaft, fifteen drilled shafts, and the starter and tail tunnels should all be excavated and the TBM should be beginning its journey. This paper and presentation will focus on the design basis, progress to date, and lessons learned.
引用
收藏
页码:69 / 80
页数:12
相关论文
共 50 条
  • [1] Construction of the Lewis Street CSO Tunnel, Nashville, Tennessee
    Doig, PJ
    1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 329 - 337
  • [2] CONSTRUCTION OF THE NORTH DORCHESTER BAY CSO STORAGE TUNNEL IN BOSTON
    Davies, J.
    Chin, K.
    Ohnigian, J.
    Stokes, J.
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1062 - 1073
  • [3] Understanding corrosion prevention in CSO and sewerage conveyance tunnel design
    Nixon, Robert A.
    Journal of New England Water Environment Association, 2010, 44 (03): : 24 - 31
  • [4] TUNNEL DESIGN AND CONSTRUCTION
    CRIGHTON, GS
    BIGGART, AR
    NORIE, EH
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1992, : 18 - 42
  • [5] DESIGN AND CONSTRUCTION OF A WIDE TUNNEL UNDER SHALLOW COVER - THE LAFAYETTE BLUFF TUNNEL SOUTH PORTAL
    PETERSEN, DL
    NELSON, CR
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES & GEOMECHANICS ABSTRACTS, 1993, 30 (07) : 1477 - 1483
  • [6] The DigIndy CSO Tunnel System
    Lewis, Maceo R.
    Maynard, Nick J.
    PIPELINES 2016 - OUT OF SIGHT, OUT OF MIND, NOT OUT OF RISK, 2016, : 1239 - 1247
  • [7] The DigIndy CSO Tunnel System
    Lewis, MacEo R.
    Maynard, Nick J.
    Pipelines 2016: Out of Sight, Out of Mind, Not Out of Risk - Proceedings of the Pipelines 2016 Conference, 2016, : 1239 - 1247
  • [8] Design and construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island
    Hughes, Geoffrey
    Kaplin, John
    Halim, Irwan
    Albert, Philip
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 824 - +
  • [9] Tunnel construction booms in South Africa
    Cross, T
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 (02) : 244 - 245
  • [10] Geotechnical considerations for the final design of the Detroit Upper Rouge Tunnel CSO Project
    Habimana, Jean
    Halim, Irwan
    Chen, Wern-Ping
    Rabbaig, Mirza M.
    Barbour, Robert
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 302 - +