An ERP system performance assessment model development based on the balanced scorecard approach

被引:20
|
作者
Chang, She-I [2 ]
Yen, David C. [1 ]
Ng, Celeste See-Pui [3 ]
Chang, I-Cheng [2 ]
Yu, Sheng-Yu [2 ]
机构
[1] Miami Univ, Dept DSC & MIS, Oxford, OH 45056 USA
[2] Natl Chung Cheng Univ, Dept Accounting & Informat Technol, Chiayi, Taiwan
[3] Yuan Ze Univ, Dept Informat Management, Chungli 32003, Taiwan
关键词
Grounded theory; Analytic hierarchy process; Fuzzy theory; Enterprise resources planning (ERP); Balanced scorecard; MANAGEMENT; IMPLEMENTATION; STRATEGY;
D O I
10.1007/s10796-009-9225-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Previously completed research has not been significant when regarding the aspect of deriving a model for measuring the performance of an Enterprise Resource Planning (ERP) system. Therefore, this research attempts to present an objective and quantitative assessment model based on the Balance Scorecard approach for the purpose of appraising the performance of the ERP system. The methodology used in this research involves the Grounded Theory, Expert Questionnaire, the Analytic Hierarchy Process, and the Fuzzy Theory to filter out and develop the KPIs for the ERP system performance assessment model. It is expected that such a model may be used by enterprises to assess the efficiency of the ERP system during the various stages of management and support within the system. Finally, this assessment model is verified in a case company through the examination of its unbiased and quantifiable assessment approach. This result allows us to further understand authentic efficiency, and explore if enterprises have fulfilled their proposed objectives after the introduction of the ERP system.
引用
收藏
页码:429 / 450
页数:22
相关论文
共 50 条
  • [1] An ERP system performance assessment model development based on the balanced scorecard approach
    She-I Chang
    David C. Yen
    Celeste See-Pui Ng
    I-Cheng Chang
    Sheng-Yu Yu
    [J]. Information Systems Frontiers, 2011, 13 : 429 - 450
  • [2] Designing a hospital performance assessment model based on balanced scorecard
    Nasiripour, Amir Ashkan
    Kazemi, Mohammad Ali Afshar
    Izadi, Ahmadreza
    [J]. HEALTHMED, 2012, 6 (09): : 2983 - 2989
  • [3] A Study of Performance Measurement Based on Balanced Scorecard under ERP System in Construction Enterprises
    Wang Xuan
    Guo Chunfang
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 608 - 610
  • [4] A performance system based on the balanced scorecard approach for measuring performance in a business environment
    Vardangalos, G
    Pantelis, A
    [J]. ISCC 2000: FIFTH IEEE SYMPOSIUM ON COMPUTERS AND COMMUNICATIONS, PROCEEDINGS, 2000, : 220 - 224
  • [5] Performance system based on the balanced scorecard approach for measuring performance in a business environment
    Vardangalos, G.
    Pantelis, A.
    [J]. IEEE Symposium on Computers and Communications - Proceedings, 2000, : 220 - 224
  • [6] Performance Assessment of a Construction Company Based on the Balanced Scorecard
    Averina, A. L.
    [J]. THIRD FORUM OF YOUNG RESEARCHERS: IN THE FRAMEWORK OF INTERNATIONAL FORUM EDUCATION QUALITY - 2012, 2012, : 3 - 6
  • [7] A study of enterprise resource planning (ERP) system performance measurement using the quantitative balanced scorecard approach
    Shen, Yung-Chi
    Chen, Pih-Shuw
    Wang, Chun-Hsien
    [J]. COMPUTERS IN INDUSTRY, 2016, 75 : 127 - 139
  • [8] Balanced Scorecard-Based Hospital Performance Measurement Framework: A Performance Construct Development Approach
    Abu Jaber, Ahmad A.
    Nashwan, Abdulqadir J.
    [J]. CUREUS JOURNAL OF MEDICAL SCIENCE, 2022, 14 (05)
  • [9] An application of the balanced scorecard to public transit system performance assessment
    Phillips, JK
    [J]. TRANSPORTATION JOURNAL, 2004, 43 (01) : 26 - 55
  • [10] An dynamic evaluation model on IS performance based on balanced scorecard
    Hao, XL
    Li, M
    Zhang, J
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 247 - 251