The Effect of Medical Device Regulations on Deploying a Lean Six Sigma Project

被引:5
|
作者
McGrane, Vincent [1 ]
McDermott, Olivia [2 ]
Trubetskaya, Anna [1 ]
Rosa, Angelo [3 ]
Sony, Michael [4 ]
机构
[1] Univ Limerick, Dept Engn, Limerick V94 T9PX, Ireland
[2] Univ Galway, Coll Sci & Engn, Galway H91 TK33, Ireland
[3] Univ LUM Jean Monnet, Dept Management Studies, I-70010 Casamassima, Italy
[4] Univ Witwatersrand, Wits Business Sch, ZA-2193 Johannesburg, South Africa
关键词
continuous improvement; medical device; MedTech; Lean Six Sigma; ISO; 13485; 21CFR; 820; validation; CRITICAL FAILURE FACTORS; BARRIERS; TRENDS;
D O I
10.3390/pr10112303
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper investigates the differences in timelines involved in Lean Six Sigma (LSS) project deployment in a regulated industry versus in an unregulated one. Two case studies utilising Lean Six Sigma methods-in order to compare the transfer of manual manufacturing lines within a medical device and electronics manufacturing site-are discussed and utilised. This research aims to show the effects of regulatory procedures on LSS project implementation and timelines. This study particularly highlights how a regulatory environment can be a barrier, or bottleneck, to project management, continuous improvement, and engineering changes in the MedTech or medical device manufacturing industry. The results of this study represent an important first step towards a full understanding of the influence of regulations on operations in medical devices and, by extension, on pharmaceutical manufacturing industries on a global scale. The research limitations are that the data collected were from two specific case study comparisons alone.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Lean Six Sigma Project for Productivity Enhancement
    Morais, Valter Rocha
    Teixeira de Sousa, Sergio Dinis
    Lopes, Isabel da Silva
    [J]. TRANSACTIONS ON ENGINEERING TECHNOLOGIES, 2016, : 207 - 221
  • [2] Deploying Lean Six Sigma framework in an automotive component manufacturing organization
    Swarnakar, Vikas
    Vinodh, S.
    [J]. INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2016, 7 (03) : 267 - 293
  • [3] Implementation of a Lean Six Sigma Project in a Production Line
    Morais, Valter R.
    Sousa, Sergio D.
    Lopes, Isabel
    [J]. WORLD CONGRESS ON ENGINEERING, WCE 2015, VOL II, 2015, : 847 - 852
  • [4] Stakeholder analysis for Lean Six Sigma project management
    Elias, Arun Abraham
    [J]. INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2016, 7 (04) : 394 - 405
  • [5] Generic Lean Six Sigma project definitions in publishing
    de Koning, Henk
    Does, Ronald J. M. M.
    Groen, Arjan
    Kemper, Benjamin P. H.
    [J]. INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2010, 1 (01) : 39 - 55
  • [6] Operationally deploying Six Sigma
    Martens, SL
    [J]. ASQ'S 55TH ANNUAL QUALITY CONGRESS PROCEEDINGS, 2001, : 751 - 755
  • [7] Investigating the green impact of Lean, Six Sigma and Lean Six Sigma
    Chugani, Nashmi
    Kumar, Vikas
    Garza-Reyes, Jose Arturo
    Rocha-Lona, Luis
    Upadhyay, Arvind
    [J]. INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2017, 8 (01) : 7 - 32
  • [8] A Lean Six Sigma (LSS) project management improvement model
    Tenera, Alexandra
    Pinto, Luis Carneiro
    [J]. SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 912 - 920
  • [9] Using Project Six Sigma and Lean Concepts in Internal Logistics
    Antunes, Daniela L.
    Sousa, Sergio D.
    Nunes, Eusebio
    [J]. WORLD CONGRESS ON ENGINEERING - WCE 2013, VOL I, 2013, : 414 - 419
  • [10] Lean, Six Sigma and Lean Six Sigma: an analysis based on operations strategy
    Drohomeretski, Everton
    Gouvea da Costa, Sergio E.
    de Lima, Edson Pinheiro
    da Rosa Garbuio, Paula Andrea
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (03) : 804 - 824