Reinforcement of the Rhein-bridge Maxau - part 2

被引:4
|
作者
Katzik, Walter [1 ]
Scherer, Mathias [1 ]
Maier, Dietmar H. [2 ]
Wuerfel, Till [2 ]
机构
[1] Regierungsprasidium Karlsruhe, Referat Ingn Bau 43, Schlosspl 1-3, D-76131 Karlsruhe, Germany
[2] Ingn Grp Bauen, Fritz Erler Str 25, D-76133 Karlsruhe, Germany
关键词
high performance concrete; pilot project; sample plate; monitoring; public participation; CONCRETE;
D O I
10.1002/stab.201900115
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Reinforcement of the Rhein-bridge Maxau - part 2 Due to fatigue cracks in the orthotropic plate of the Rhein-bridge Maxau, the reinforcement of the bridge deck is carried out by bonding a high strength concrete overlay to the deck. In Germany it is the first time, that a deck of a big steel bridge is strengthened in that manner. Valuable experience was obtained in a pilot project in advance. The construction process is described in detail. The succesful realization will allow further applications of this strengthening technique in Germany.
引用
收藏
页码:193 / +
页数:10
相关论文
共 50 条
  • [31] Renovation Rheinvorland-Bridge at Worms: Bridge Construction and Interaction with the Railway Superstructure - Part 2
    Casper, Hans-Joachim
    Eckersberg, Gerald
    Erlenbusch, Bernd
    Fruehauf, Wolfgang
    Knob, Wolfgang
    Sachse, Frank
    STAHLBAU, 2012, 81 (08) : 624 - 631
  • [32] The effect of asymmetric reinforcement on curved bridge
    Dai Fan
    He Jian
    You Shangyou
    Luo Muxin
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING, 2015, 39 : 1096 - 1101
  • [33] The application of Structural adhesives in the bridge reinforcement
    Chen, Min
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES, PTS 1-3, 2013, 655-657 : 2288 - 2293
  • [34] Experimental evaluation of connectors for bridge reinforcement
    Verreault, C
    Beaulieu, D
    Picard, A
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1997, 24 (05) : 705 - 715
  • [35] Peljesac bridge, Croatia-Part 2: Construction and Assembly
    Pipenbaher, M.
    BAUINGENIEUR, 2023, 98 (06): : 188 - 196
  • [36] The Reinforcement and Optimum Design of JiShan Bridge
    Chen Xuyong
    Li Shu
    Li Jie
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 879 - +
  • [37] Bridge Inspection and Reinforcement Technology Application
    Li, Hezhi
    Liu, Fanghua
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MANAGEMENT, EDUCATION, INFORMATION AND CONTROL, 2015, 125 : 1502 - 1509
  • [38] REINFORCEMENT FOR CONCRETE BRIDGE DECKS.
    Beal, David B.
    Research Report - New York State Department of Transportation, Engineering Research and Developmen, 1983,
  • [39] ADHAMIYAH BRIDGE, BAGHDAD - PART 2. CONSTRUCTION.
    Al-Bayah, Ismail I.
    Lee, D.J.
    Structural Engineer, 1984, 62 A (01): : 18 - 25
  • [40] Bear Mountain Bridge cable reinforcement
    Moreau, William A.
    Dragan, Radu
    Sluszka, Peter
    Advances in Cable-Supported Bridges, 2006, : 163 - 173