Evaluation of Investment Risk in International Engineering Project Based on Improved Risk Matrix Method

被引:0
|
作者
Liu, Jin [1 ]
Gao, Xuanneng [1 ]
机构
[1] Huaqiao Univ, Coll Civil Engn, Xiamen 361021, Fujian, Peoples R China
来源
关键词
International Engineering Project; Evaluation of Investment Risk; Improved Risk Matrix; Analytic Hierarchy Process;
D O I
10.4028/www.scientific.net/AMR.255-260.3887
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, risk acceptability evaluation and risk weight and improved risk level were added in original risk matrix method according to its shortcomings and practicality and need of evaluation of investment risk in international engineering project. A model based on improved risk matrix method was put forward to evaluate investment risk in international engineering project. Firstly, investment risk evaluation index system of international engineering project was established. Secondly, level of risk factors were decided by risk impact level and risk probability scope, borda ordinal value was calculated to form judgment matrix, analytic hierarchy process was introduced to calculate risk weight. Synthetic risk level was determined by product of quantized value of risk level and corresponding risk weight. Risk acceptability evaluation was decided by risk impact level risk probability scope. Finally, a case study was presented to verify the feasibility of the model which would provide a reliable basis for the investment decision.
引用
收藏
页码:3887 / 3892
页数:6
相关论文
共 50 条
  • [21] Study on investment risk of engineering project based on LS-SVM
    Feng, Li-Jun
    Wang, Ping
    Xu, Lin-Na
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 2796 - +
  • [22] Risk evaluation of international engineering project based on multi-level fuzzy comprehensive evaluation model
    Juan, Chen
    Wang Weifu
    TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 268 - 275
  • [23] Risk Assessment of Contractor Support Based on Improved Risk Matrix Method
    张福元
    李东阳
    耿斌
    刘占岭
    JournalofShanghaiJiaotongUniversity(Science), 2015, 20 (04) : 464 - 467
  • [24] Risk assessment of contractor support based on improved risk matrix method
    Zhang F.-Y.
    Li D.-Y.
    Geng B.
    Liu Z.-L.
    Journal of Shanghai Jiaotong University (Science), 2015, 20 (04) : 464 - 467
  • [25] Analysis on fuzzy integrated method of engineering project risk evaluation
    Li, XY
    Dai, DS
    Zhang, K
    PROCEEDINGS OF THE 2003 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2003, : 52 - 55
  • [26] A risk evaluation method for the high-tech project investment based on uncertain linguistic variables
    Liu, Peide
    Zhang, Xin
    Liu, Weilong
    TECHNOLOGICAL FORECASTING AND SOCIAL CHANGE, 2011, 78 (01) : 40 - 50
  • [27] Research on Project Risk Management of Power Engineering Based on Fuzzy Comprehensive Evaluation Method
    Zheng Lixin
    AUTOMATIC CONTROL AND MECHATRONIC ENGINEERING II, 2013, 415 : 287 - 293
  • [28] Research On Risk Management Of Power Engineering Project Based On Fuzzy Comprehensive Evaluation Method
    Li Jia-ming
    PROCEEDINGS OF THE 2017 2ND JOINT INTERNATIONAL INFORMATION TECHNOLOGY, MECHANICAL AND ELECTRONIC ENGINEERING CONFERENCE (JIMEC 2017), 2017, 62 : 325 - 329
  • [29] Multi-attribute Evaluation for International Construction Project Risk Based on Triangular Fuzzy Matrix
    Liu Renhui
    Zhang Changchun
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 291 - 294
  • [30] Innovation Project Investment Risk Evaluation Model
    Yuan Xiu-e
    Yuan Zhen-Zhen
    2009 INTERNATIONAL CONFERENCE ON FUTURE BIOMEDICAL INFORMATION ENGINEERING (FBIE 2009), 2009, : 409 - 412