Wetland Restoration Planning Approach Based on Interval Fuzzy Linear Programming under Uncertainty

被引:4
|
作者
Zhang, Yang [1 ]
Shen, Jing [1 ]
机构
[1] China Jiliang Univ, Coll Econ & Management, Hangzhou 310018, Peoples R China
基金
中国国家自然科学基金; 中国国家社会科学基金;
关键词
wetland restoration planning; wetland management; interval fuzzy linear programming; decision-making framework; uncertainty methods; ECOSYSTEM SERVICES; ENVIRONMENTAL-MANAGEMENT; VULNERABILITY ASSESSMENT; CONSERVATION; MODEL;
D O I
10.3390/ijerph18189549
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
When planning wetland restoration projects, the planting area allocation and the costs of the restoration measures are two major issues faced by decision makers. In this study, a framework based on the interval fuzzy linear programming (IFLP) method is introduced for the first time to plan wetland restoration projects. The proposed framework can not only effectively deal with interval and fuzzy uncertainties that exist in the planning process of wetland restorations but also handle trade-offs between ecological environment benefits and economic cost. This framework was applied to a real-world wetland restoration planning problem in the northeast of China to verify its validity and examine the credibility of the constraints. The optimized results obtained from the framework that we have developed indicate that higher ecological and social benefits can be obtained with optimal restoration costs after using the wetland restoration decision-making framework. The optimal restoration measure allocation schemes obtained by IFLP under different credibility levels can help decision makers generate a range of alternatives, which can also provide decision suggestions to local managers to generate a satisfactory decision-making plan. Furthermore, a comparison was made between the IFLP model and ILP model in this study. The comparison results indicate that the IFLP model provides more information regarding ecological environment and economic trade-offs between the system objective, certainty, and reliability. This framework provides managers with an effective way to plan wetland restoration projects, while transference of the model may help solve similar problems.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] An interval-parameter minimax regret programming approach for power management systems planning under uncertainty
    Dong, C.
    Huang, G. H.
    Cai, Y. P.
    Xu, Y.
    APPLIED ENERGY, 2011, 88 (08) : 2835 - 2845
  • [42] An interval-parameter chance-constrained dynamic programming approach for capacity planning under uncertainty
    Dai, C.
    Li, Y. P.
    Huang, G. H.
    RESOURCES CONSERVATION AND RECYCLING, 2012, 62 : 37 - 50
  • [43] Robust interval linear programming for environmental decision making under uncertainty
    Fan, Y. R.
    Huang, G. H.
    Li, Y. P.
    ENGINEERING OPTIMIZATION, 2012, 44 (11) : 1321 - 1336
  • [44] A note on "Generalized fuzzy linear programming for decision making under uncertainty: Feasibility of fuzzy solutions and solving approach"
    Kumar, Amit
    Appadoo, S. S.
    Bector, C. R.
    INFORMATION SCIENCES, 2014, 266 : 226 - 227
  • [45] An Interval-Parameter Fuzzy Linear Programming with Stochastic Vertices Model for Water Resources Management under Uncertainty
    Han, Yan
    Huang, Yuefei
    Jia, Shaofeng
    Liu, Jiahong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [46] SRFILP: A Stochastic Robust Fuzzy Interval Linear Programming Model for Municipal Solid Waste Management under Uncertainty
    Xu, Y.
    Huang, G. H.
    Qin, X. S.
    Huang, Y.
    JOURNAL OF ENVIRONMENTAL INFORMATICS, 2009, 14 (02) : 74 - 82
  • [47] A Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach
    Mokhtari, H.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2016, 29 (04): : 524 - 529
  • [48] Interval linear programming model for long-term planning of vehicle recycling in the Republic of Serbia under uncertainty
    Simic, Vladimir
    Dimitrijevic, Branka
    WASTE MANAGEMENT & RESEARCH, 2015, 33 (02) : 114 - 129
  • [49] Tactical project planning under uncertainty: fuzzy approach
    Masmoudi, Malek
    Hans, Erwin W.
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 10 (03) : 301 - 322
  • [50] Relating fuzzy and interval approaches to the access network planning under uncertainty
    Carlson, Carlos M.F.
    Tavares, Hermano M.F.
    Formigoni, Jose R.F.
    Conference Record / IEEE Global Telecommunications Conference, 1998, 2 : 1071 - 1076