Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling

被引:5
|
作者
Jing, Zha [1 ]
Hua, Jin [1 ]
Yi, Zhu [1 ]
机构
[1] Three Gorges Univ, Coll Mech & Power Engn, Yichang 443002, Hubei, Peoples R China
基金
美国国家科学基金会;
关键词
Preventive maintenance; Flexible job shop scheduling; Integrated optimization; Improved genetic algorithm;
D O I
10.2991/978-94-6239-255-7_25
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to discuss the influence of equipment failure on the production schedule and equipment utilization rate in the pull production environment, a multi-objective integrated optimization problems of preventive maintenance planning and flexible job-shop scheduling model is established. The model is to minimize both the maximum completion time and the total equipment ' s workload. In this article an improved genetic algorithm is proposed to solve the problem. The multi-objective optimization model was compared with independent maintenance model to verify its superiority, and the multi-objective improved GA can find more Pareto solutions for the decision maker. Finally the example calculation shows that the integrated optimization can find the solution with shorter completion time, eliminate waste and improve production efficiency.
引用
收藏
页码:137 / 141
页数:5
相关论文
共 50 条
  • [41] A hybrid artificial bee colony algorithm for multi-objective flexible job-shop scheduling problem
    Meng, Guan-Jun
    Chen, Xin-Hua
    Yang, Da-Chun
    Zhang, Wei
    Journal of Computers (Taiwan), 2020, 31 (05) : 224 - 235
  • [42] A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem
    Fernandez Perez, Miguel A.
    Raupp, Fernanda M. P.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (02) : 409 - 416
  • [43] Multi-Objective Flexible Job-Shop Scheduling Problem with DIPSO: More Diversity, Greater Efficiency
    Felix Carvalho, Luiz Carlos
    Fernandes, Marcia Aparecida
    2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, : 282 - 289
  • [44] Scheduling of Dynamic Multi-Objective Flexible Enterprise Job-Shop Problem Based on Hybrid QPSO
    Chen, Wei
    Yang, Hong
    Hao, Yifei
    IEEE ACCESS, 2019, 7 : 127090 - 127097
  • [45] Variable neighborhood particle swarm optimization for multi-objective flexible job-shop scheduling problems
    Liu, Hongbo
    Abraham, Ajith
    Choi, Okkyung
    Moon, Seong Hwan
    SIMULATED EVOLUTION AND LEARNING, PROCEEDINGS, 2006, 4247 : 197 - 204
  • [46] A Memetic Algorithm based on Immune Multi-objective Optimization for Flexible Job-shop Scheduling Problems
    Ma, Jingjing
    Lei, Yu
    Wang, Zhao
    Jiao, Licheng
    Liu, Ruochen
    2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, : 58 - 65
  • [47] Optimization of Multi-objective Job-shop Scheduling under Uncertain Environment
    Wang C.
    Zeng L.
    Journal Europeen des Systemes Automatises, 2019, 52 (02): : 179 - 183
  • [48] OPTIMIZATION OF DYNAMIC AND MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING BASED ON PARALLEL HYBRID ALGORITHM
    Yang, X. P.
    Gao, X. L.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2018, 17 (04) : 724 - 733
  • [49] Comments on "An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems"
    Xing, Li-Ning
    Chen, Ying-Wu
    Yang, Ke-Wei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) : 1735 - 1736