An investigation into challenges and opportunities in the Australian construction and demolition waste management system

被引:27
|
作者
Shooshtarian, Salman [1 ]
Caldera, Savindi [2 ]
Maqsood, Tayyab [3 ]
Ryley, Tim [4 ]
Khalfan, Malik [5 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, Melbourne, Vic, Australia
[2] Griffith Univ, Cities Res Inst, Brisbane, Qld, Australia
[3] RMIT Univ, Property Construct & Project Management, Melbourne, Vic, Australia
[4] Griffith Univ, Sch Engn & Built Environm, Brisbane, Qld, Australia
[5] RMIT Univ, Melbourne, Vic, Australia
关键词
Sustainable procurement; Waste policy; C&D waste regulation; Overregulation; Recycled waste materials; Circular economy; IMPLEMENTATION; PROJECTS;
D O I
10.1108/ECAM-05-2021-0439
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The literature shows that the current Australian waste management framework does not meet industry and government expectations. This study, therefore, seeks the key construction and demolition (C&D) stakeholders' insights on various issues identified. It aims to understand the main barriers to effective C&D waste management, examining the role of the federal government and exploring perceptions around waste regulations, policies and schemes. Design/methodology/approach An online survey was conducted in 2019 to capture stakeholder perceptions. One hundred and thirty-two participants from various industries and government agencies representing Australian jurisdictions took part in the survey. Quantitative and qualitative data were collected. Findings The results show that the main barriers are "overregulation, tough acceptance criteria and increased testing requirements", "lack of local market" and "culture, poor education and low acceptance". The main areas of improvement include "providing a guideline that determines the accepted level of contamination for reusing C&D waste", "preparation of guidelines on requirements of using recycled C&D materials in different industries" and "setting a target for reduction, reusing and recycling C&D waste". Research limitations/implications Some research findings may not be generalisable beyond Australia, but there are interesting insights for an international audience. The results inform policy development within the Australian states and territories context, to support the design and implementation of a circular economy model in the construction industry. The findings are evidence for a broader discussion to solve prevailing issues in C&D waste management, notably in the context of construction materials' end of life management. Practical implications The study highlights that policy development needs to be further expanded to include new/current waste management schemes including manufacturer's shared responsibility of waste generation, subsidies for C&D waste recycled materials and the proximity principle. Originality/value This paper provides a clear insight into C&D waste management stakeholders' perceptions towards the current waste management system in Australia.
引用
收藏
页码:4313 / 4330
页数:18
相关论文
共 50 条
  • [21] Machine learning in construction and demolition waste management: Progress, challenges, and future directions
    Gao, Yu
    Wang, Jiayuan
    Xu, Xiaoxiao
    AUTOMATION IN CONSTRUCTION, 2024, 162
  • [22] Review on Sustainable Construction and Demolition Waste Management-Challenges and Research Prospects
    Islam, Noushin
    Sandanayake, Malindu
    Muthukumaran, Shobha
    Navaratna, Dimuth
    SUSTAINABILITY, 2024, 16 (08)
  • [23] Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization
    Won, Jongsung
    Cheng, Jack C. P.
    AUTOMATION IN CONSTRUCTION, 2017, 79 : 3 - 18
  • [24] The building cost system in Andalusia: application to construction and demolition waste management
    Marrero, Madelyn
    Ramirez-De-Arellano, Antonio
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (05) : 495 - 507
  • [25] Construction and demolition waste management: a conceptual framework
    Esa, Mohd Reza
    Halog, Anthony
    Rigamonti, Lucia
    International Journal of Environment and Waste Management, 2024, 35 (03) : 278 - 306
  • [26] Preliminary study for the management of construction and demolition waste
    Kourmpanis, B.
    Papadopoulos, A.
    Moustakas, K.
    Stylianou, M.
    Haralambous, K. J.
    Loizidou, M.
    WASTE MANAGEMENT & RESEARCH, 2008, 26 (03) : 267 - 275
  • [27] Proposition for waste management of construction and demolition of Cuiaba
    Naime, Roberto
    Abreu, Eduardo Figueiredo
    Attilio, Dioni Maria
    REVISTA ELETRONICA EM GESTAO EDUCACAO E TECNOLOGIA AMBIENTAL, 2013, 15 (15): : 2902 - 2911
  • [28] Environmental management of construction and demolition waste in Kuwait
    Kartam, N
    Al-Mutairi, N
    Al-Ghusain, I
    Al-Humoud, J
    WASTE MANAGEMENT, 2004, 24 (10) : 1049 - 1059
  • [29] Trend of the research on construction and demolition waste management
    Yuan, Hongping
    Shen, Liyin
    WASTE MANAGEMENT, 2011, 31 (04) : 670 - 679
  • [30] ENVIRONMENTAL MANAGEMENT OF CONSTRUCTION AND DEMOLITION WASTE IN ROMANIA
    Corches, M. T.
    Popa, D. V.
    JOURNAL OF ENVIRONMENTAL PROTECTION AND ECOLOGY, 2018, 19 (01): : 146 - 151