Braess paradox and double-loop optimization method to enhance power grid resilience

被引:30
|
作者
Zhang, Xi [1 ]
Tu, Haicheng [2 ]
Guo, Jianbo [3 ]
Ma, Shicong [3 ]
Li, Zhen [1 ]
Xia, Yongxiang [2 ]
Tse, Chi Kong [4 ]
机构
[1] Beijing Inst Technol, Sch Automat, Beijing 100081, Peoples R China
[2] Hangzhou Dianzi Univ, Sch Commun Engn, Hangzhou 310018, Peoples R China
[3] China Elect Power Res Inst, Beijing 100192, Peoples R China
[4] City Univ Hong Kong, Dept Elect Engn, Kowloon, Hong Kong, Peoples R China
基金
美国国家科学基金会;
关键词
Power grid resilience; Largest supply capacity; Braess paradox; Double-loop optimization; SYSTEMS; RESTORATION; MICROGRIDS; DYNAMICS;
D O I
10.1016/j.ress.2021.107913
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Multiple physical failures and severe power disruptions occur in power grid under extreme operation conditions. In this paper, we study power grid resilience and derive quick recovery methods through adjusting the operating modes of available components and reconfiguring the remaining network. The largest amount of power that is available to the loads after reorganizing the remaining undamaged components in the post-disaster stage is identified as an important resilience indicator. An interior point method is firstly used to find the largest amount of power supply (LPS) of fixed topology. The post-disaster network should contain as many available components as possible in order to give the best topological connection. However, disconnecting some undamaged components proactively can further increase the LPS. This phenomenon can be interpreted as the Breass paradox and is effectively a combinatorial network reconfiguration. A double-loop optimization strategy is proposed to achieve the LPS available to the post-disaster network, where the interior point method serves the inner optimization loop and the outer optimization loop generates an optimal topology using a genetic algorithm. Simulation results verify the efficacy of the proposed method in achieving a quick power recovery in extreme events. Our work provides useful advice to power grid operators on how to effectively coordinate available resources after extreme events occur.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] A Double-Loop Primary-Side Control Structure for HB-LED Power Regulation
    Shagerdmootaab, Ali
    Moallem, Mehrdad
    IEEE TRANSACTIONS ON POWER ELECTRONICS, 2016, 31 (03) : 2476 - 2484
  • [42] Reliability-based design optimization using adaptive Kriging-A single-loop strategy and a double-loop one
    Ma, Yuan-Zhuo
    Jin, Xiang-Xiang
    Wu, Xi-Long
    Xu, Chang
    Li, Hong-Shuang
    Zhao, Zhen-Zhou
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 237
  • [43] Multi-parameter optimization of double-loop fluidized bed solar reactor for thermochemical fuel production
    Milanese, Marco
    Colangelo, Gianpiero
    Laforgia, Domenico
    de Risi, Arturo
    ENERGY, 2017, 134 : 919 - 932
  • [44] Novel Method of Optimization of Losses in Power Grid
    Mueller, Zdenek
    Mueller, Miroslav
    Tuzikova, Valeria
    Tlusty, Josef
    Cernan, Martin
    Beck, Yuval
    Golan, Gady
    2016 IEEE INTERNATIONAL CONFERENCE ON THE SCIENCE OF ELECTRICAL ENGINEERING (ICSEE), 2016,
  • [45] Asymmetric calibration method on a back-to-back double-loop differential magnetic field probe
    He, Xiao
    Huang, Lijuan
    Zeng, Dezhi
    Hou, Bo
    Chi, Yuan
    Li, En
    IET SCIENCE MEASUREMENT & TECHNOLOGY, 2024, 18 (03) : 116 - 122
  • [46] Chance-Constrained Optimal Distribution Network Partitioning to Enhance Power Grid Resilience
    Biswas, Shuchismita
    Singh, Manish K.
    Centeno, Virgilio A.
    IEEE ACCESS, 2021, 9 : 42169 - 42181
  • [47] A double loop optimization method for gasoline online blending
    Chen, Weiheng
    Yang, Jun
    PROCEEDINGS 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT), 2016, : 622 - 627
  • [48] Quadrotors' double-loop controller design with tensor product model transformation and partial fully actuated method
    Chang, Fei
    Kang, Jia Pei
    Huang, Sha Ri Na
    Zhao, Guo Liang
    ISA TRANSACTIONS, 2024, 150 : 181 - 197
  • [49] Reliability-based optimization of a prestressed concrete roof girder using a surrogate model and the double-loop approach
    Slowik, Ondrej
    Lehky, David
    Novak, Drahomir
    STRUCTURAL CONCRETE, 2021, 22 (04) : 2184 - 2201
  • [50] Reliability index function approximation based on adaptive double-loop Kriging for reliability-based design optimization
    Zhang, Xiaobo
    Lu, Zhenzhou
    Cheng, Kai
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 216