Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level

被引:12
|
作者
Caetano, Luis Filipe [1 ]
Teixeira, Paulo Fonseca [1 ]
机构
[1] Univ Lisbon, IST, Ave Rovisco Pais, P-1049001 Lisbon, Portugal
关键词
Railway track; Renewal; Life-cycle costs; User costs; Optimization; Railway network; MAINTENANCE; DECISION; SLEEPERS;
D O I
10.1061/(ASCE)IS.1943-555X.0000292
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents an optimization model for scheduling railway ballast, rail, and sleeper renewal operations at a network level. The objective of the model is to minimize the expected railway track life-cycle cost (LCC) and track unavailability costs derived from user impacts caused by traffic disruption during track renewal operations. To minimize costs, the model assesses the opportunistic renewal of railway track components and takes advantage of planning from a network perspective to study the possibility of reusing track components on different lines. The practical utility of the model is illustrated with a case study involving the Portuguese railway network. The results indicate that user costs have an important influence on decision making in the track renewal process and that the network perspective of renewal planning can reduce the direct costs of these operations. (C) 2016 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 27 条
  • [21] Using an artificial neural network prediction model to optimize work-in-process inventory level for wafer fabrication
    Lin, Yu-Hsin
    Shie, Jie-Ren
    Tsai, Chih-Hung
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (02) : 3421 - 3427
  • [22] Strategic equilibrium model of carrier and shipper for container transportation network: A bi-level competitive approach
    Guo, ZJ
    Song, XQ
    TRAFFIC AND TRANSPORTATION STUDIES, PROCEEDINGS, 2004, : 308 - 316
  • [23] A Multiobjective Integer Linear Programming Model for the Cross-Track Line Planning Problem in the Chinese High-Speed Railway Network
    Han, Peiwen
    Nie, Lei
    Fu, Huiling
    Gong, Yantao
    Wang, Gang
    SYMMETRY-BASEL, 2019, 11 (05):
  • [24] Bi-level multi-objective programming model for inter-city railway network scale planning
    Lü, Ming
    Luo, Xia
    Tang, Li
    Journal of Beijing Institute of Technology (English Edition), 2012, 21 (SUPPL.2): : 189 - 195
  • [25] Enhancing High-Speed Railway Timetable Resilience: A Two-Level Spatiotemporal Network Model Focused on Disturbance Absorption
    Chen, Zengxin
    Chen, Junhua
    Zheng, Han
    Gao, Tianze
    URBAN RAIL TRANSIT, 2025, 11 (01) : 67 - 89
  • [26] Multi-Objective Model to Improve Network Reliability Level under Limited Budget by Considering Selection of Facilities and Total Service Distance in Rescue Operations
    Wang, Yiying
    Xu, Zeshui
    Filip, Florin Gheorghe
    INTERNATIONAL JOURNAL OF COMPUTERS COMMUNICATIONS & CONTROL, 2022, 17 (01)
  • [27] Optimizing Electric Bus Charging Infrastructure: A Bi-Level Mathematical Model for Strategic Station Location and Off-Board Charger Allocation in Transportation Network
    Kunawong, Patcharida
    Nakkiew, Warisa
    Jewpanya, Parida
    Nakkiew, Wasawat
    MATHEMATICS, 2025, 13 (05)