Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction

被引:78
|
作者
Arashpour, Mehrdad [1 ]
Wakefield, Ron [1 ]
Lee, E. W. M. [2 ]
Chan, Ricky [3 ]
Hosseini, M. Reza [4 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, 360 Swanston St, Melbourne, Vic 3000, Australia
[2] City Univ Hong Kong, Dept Architecture & Civil Engn, Kowloon, Hong Kong, Peoples R China
[3] RMIT Univ, Sch Civil Environm & Chem Engn, 360 Swanston St, Melbourne, Vic 3000, Australia
[4] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
关键词
Decision making; Delay; Discrete event simulation; Integration; Performance measures; Prefabricated building elements; Project management; Resource availability; Workflow variance; PROJECT-MANAGEMENT; RISK-MANAGEMENT; COST; SIMULATION; SCHEDULE; SYSTEMS; OPTIMIZATION; FRAMEWORK; IMPACT; TIME;
D O I
10.1016/j.ijproman.2016.02.004
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Interaction and integration of uncertainties in on-site and off-site project activities often result in the risk of delays and schedule overruns in hybrid construction projects. To address this problem, a holistic risk analysis approach that assesses the integrating impact of uncertainties on completion times is proposed. The results of the analysis show that growth in project size and work quantities intensifies pair and group interconnection of tasks within and between groups of on-site and off-site activities, resulting in lengthened completion times and deviations from project plans. Unavailability of resources, risk seeking attitudes, and workflow variability are other major contributors to the risk of late completion in hybrid construction. While project managers often analyze on-site and off-site uncertainties separately, practical implications of the research results suggest adoption of a holistic approach in which risk management practices in the two environments are integrated. This approach significantly improves tangible performance measures in projects. (C) 2016 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:1393 / 1402
页数:10
相关论文
共 50 条
  • [41] From off-site to on-site: A Flexible Framework for XR Prototyping in Sports Spectating
    Lo, Wei Hong
    Zollmann, Stefanie
    Regenbrecht, Holger
    [J]. PROCEEDINGS OF THE 2021 36TH INTERNATIONAL CONFERENCE ON IMAGE AND VISION COMPUTING NEW ZEALAND (IVCNZ), 2021,
  • [42] LABOR PRODUCTIVITY IN OFF-SITE CONSTRUCTION: A LITERATURE REVIEW AND IMPLICATIONS FOR FUTURE RESEARCH
    Alazzaz, Faisal
    Whyte, Andrew
    [J]. IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : A59 - A64
  • [43] Comparison of on-site and off-site robot solutions to the traditional framing and drywall installation tasks
    Cynthia Brosque
    Jen Tobias Hawkins
    Tony Dong
    Joakim Örn
    Martin Fischer
    [J]. Construction Robotics, 2023, 7 (1) : 19 - 39
  • [44] Adopting off-site construction into the Saudi Arabian construction industry
    Trigunarsyah B.
    Santoso T.P.
    Hassanain M.A.
    Tuffaha F.
    [J]. Proceedings of the Institution of Civil Engineers: Smart Infrastructure and Construction, 2021, 173 (03) : 55 - 62
  • [45] Impoverishment assessment of slum dwellers after off-site and on-site resettlement: a case of Indore
    Patel, Sejal
    Mandhyan, Ritika
    [J]. COMMONWEALTH JOURNAL OF LOCAL GOVERNANCE, 2014, (15): : 104 - 127
  • [46] Off-site focus
    [J]. Concrete Engineering International, 3 (05):
  • [47] On-site and off-site inwestern Serbia: A geoarchaeological perspective of Obrovac-type settlements
    Tripkovic, Boban
    Penezic, Kristina
    [J]. QUATERNARY INTERNATIONAL, 2017, 429 : 35 - 44
  • [48] A sedimentological connectivity approach for assessing on-site and off-site soil erosion control services
    Liu, Yu
    Zhao, Liang
    Yu, Xiubo
    [J]. ECOLOGICAL INDICATORS, 2020, 115
  • [49] OFF-SITE ARCHAEOLOGY
    WILKINSON, TJ
    [J]. RESEARCH & EXPLORATION, 1992, 8 (02): : 196 - 207
  • [50] Off-site focus
    [J]. Concrete Engineering International, 3 (04):