Volatility estimation for stochastic project value models

被引:28
|
作者
Brandao, Luiz E. [2 ]
Dyer, James S. [3 ]
Hahn, Warren J. [1 ]
机构
[1] Pepperdine Univ, Graziadio Sch Business & Management, Malibu, CA 90263 USA
[2] Pontificia Univ Catolica Rio de Janeiro, BR-22450900 Rio De Janeiro, RJ, Brazil
[3] Univ Texas Austin, McCombs Sch Business, Austin, TX 78712 USA
关键词
Volatility; Real options; Simulation; Investment decisions; PRICE;
D O I
10.1016/j.ejor.2012.01.059
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
One of the key parameters in modeling capital budgeting decisions for investments with embedded options is the project volatility. Most often, however, there is no market or historical data available to provide an accurate estimate for this parameter. A common approach to estimating the project volatility in such instances is to use a Monte Carlo simulation where one or more sources of uncertainty are consolidated into a single stochastic process for the project cash flows, from which the volatility parameter can be determined. Nonetheless, the simulation estimation method originally suggested for this purpose systematically overstates the project volatility, which can result in incorrect option values and non-optimal investment decisions. Examples that illustrate this issue numerically have appeared in several recent papers, along with revised estimation methods that address this problem. In this article, we extend that work by showing analytically the source of the overestimation bias and the adjustment necessary to remove it. We then generalize this development for the cases of levered cash flows and non-constant volatility. In each case, we use an example problem to show how a revised estimation methodology can be applied. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:642 / 648
页数:7
相关论文
共 50 条