Dynamic visual simulation of construction project based on GIS

被引:0
|
作者
Li Liangbao [1 ]
Cheng Feifei [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150006, Peoples R China
关键词
project construction; visual simulation; GIS;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
With the development of computer graphic technology and popularization of simulation, visualization applied in simulation has been an important trend in advanced simulation technology. Visualization can describe information difficult for expression, and is convenient for information communication, as well as accelerating modeling, improving simulation efficiency, and reducing the operation level. This paper combines geographic information system (GIS) and simulation technology providing output system of large construction three dimension dynamic visual simulation based on GIS to realize simulation process and visualization of simulation result. This approach changes traditional simulation pattern which can directly reflect complex time space logic relations among construction activities, clarify inner dynamic action characteristics of construction system, and provide a powerful tool for comprehensive understanding construction quickly in whole life cycle and for comparative analysis of multi-projects.
引用
收藏
页码:587 / 590
页数:4
相关论文
共 50 条
  • [1] A GIS-BASED VISUAL INFORMATION MODEL FOR BUILDNG CONSTRUCTION PROJECT MANAGEMENT
    Dib, Hazar
    Adamo-Villani, Nicoletta
    Issa, Raja R. A.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2013, 13 (01) : 1 - 18
  • [2] Study on GIS-Based Flood Routing Dynamic Visual Simulation
    Yan Jun'ai
    Zhang Hongbing
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2008, : 227 - 230
  • [3] Gis-based visual simulation methodology for concrete dam construction processes
    Zhong, DH
    Li, JR
    Zhu, HR
    [J]. SYSTEM SIMULATION AND SCIENTIFIC COMPUTING (SHANGHAI), VOLS I AND II, 2002, : 295 - 300
  • [4] Visual computer-aided design and analysis with dynamic simulation for hydroelectric project construction
    Liu, DH
    Zhong, DH
    Zhu, HR
    [J]. FOURTH INTERNATIONAL CONFERENCE ON VIRTUAL REALITY AND ITS APPLICATIONS IN INDUSTRY, 2004, 5444 : 494 - 501
  • [5] Dynamic Visual Simulation of Railway Engineering Construction Based on Virtual Geographical Environment
    Zhao, Wen
    [J]. Journal of Railway Engineering Society, 2021, 38 (04) : 97 - 102
  • [6] GIS-based visual simulation methodology and its application to underground power station construction
    Li, JR
    Zhong, DH
    [J]. System Simulation and Scientific Computing, Vols 1 and 2, Proceedings, 2005, : 95 - 99
  • [7] Visual dynamic simulation and optimization of Zhangjiuhe diversion project
    Zhong D.
    Liu J.
    Xiong K.
    Fu J.
    [J]. Transactions of Tianjin University, 2008, 14 (3) : 186 - 192
  • [8] Visual Dynamic Simulation and Optimization of Zhangjiuhe Diversion Project
    钟登华
    刘建民
    熊开智
    付金强
    [J]. Transactions of Tianjin University, 2008, (03) : 186 - 192
  • [9] GIS-Based Simulation of Engineering Construction Schedule
    张静
    钟登华
    胡程顺
    [J]. Transactions of Tianjin University, 2005, (06) : 407 - 411
  • [10] Study on dynamic visual simulation system for complex construction processes
    Zhong, DH
    Zhang, WB
    Li, JR
    Yang, QX
    Hu, CS
    [J]. COMPUTER SCIENCE AND TECHNOLOGY IN NEW CENTURY, 2001, : 429 - 433